DEFECT 

REASON 

 

ELIMINATION 

1. the pilot light on the main 

switch is not on after the 
boiler has been switched on  

No el. voltage on the boilers input 

 

Check the voltage in the socket  

Defect pilot lamp  

 

Exchange the switch 

2. boiler sets on fire but goes 

out immediately 

A wrong connection between the 
inner and phase conductor in 
supply socket  

 

Check and change of connection: 
Terminal U- phase conductor  
Terminal N – zero conductor 

Impurities filter on the gas valve 
input clogged 

 

Clean the gas valve filter  

3. boiler cannot be lit – the 

safety thermostat switched 
off (on the control panel in 
network module there the 
exceeded temperature 
signalling lamp is on) 

 

 

Thermostat unblock in network module - 
TB 

Insufficient water circulation  
(the pump doesn’t work) 
filter before the pump clogged 

*  Switch over the revolutions 

Check the pump operation (rotor release)  

 

Pump replacement 

Filter before the pump clogged  

 

Clean the filter 

Lack of water in system 

 

Check the water pressure in system and if 
necessary refill water  

*  Check the pressure in expansion 

reservoir (if there is used a closed heating 
system)  

4. burner defect signalling  

The pump thermostat does not 
switch on  

 

exchange the thermostat 

 

 

Possible defects and the way of their 
elimination are shown in burner 
documentation  

 

13.  Guarantee and liability for defects 

 

Setting up a claim to responsibility for defects is ruled by § 422-441 and for indemnity by § 373-386 
Commercial Code. 
VIADRUS a.s. provides the guarantee: 

 

For boilers 24 months after the boiler putting into operation, but maximum 30 months after the date it was 
dispatched from the manufacturing factory.  

 

For boiler drum 5 years after the date its dispatch from the manufacturing factory.  

 

The manufacturer requires for guarantee applicability: 

 

In  sense  of  Act  no.  222/94  Coll.„On

  business  conditions  and  government  administration  in  certified 

branches  and  on  State  electricity  inspection

 “ and 

Č

SN 38 6405, EN 1775 to carry out regularly once a 

year the check of natural gas or furnace oil extra light TOEL boilers. The checks can only be done by an 
authorized organization (contractual service), accredited by VIADRUS a.s., the manufacturer. 

 

In case of 5 segmental boilers it is necessary to observe the conditions set by Collection of Laws 
no. 91/1993 and 

Č

SN 07 0703, 

Č

SN 38 6420. 

 

In  case  of  VIADRUS  G  50  in  5  segmental  design  the  List  of  documents  for  a  revision  book 
according  to  regulations  issued  by  Czech  Office  for  labour  safety  to  secure the labour safety in 
low-pressure steam-boiler rooms (91/1993) is a part of commercial & technical documentation.  

 

To  document  all  records  about  carried  out  guarantee  and  after-guarantee  repairs  and  regular  annual 
checkups in the annex enclosed to the guarantee certificate.  

The guarantee does not apply to:  

 

Faults caused by improper assembly and improper attendance of the product and faults caused 
by improper maintenance see chap. 10 

 

Product damage arised during the transport or other mechanical damage 

 

Faults caused by rought storage  

 

Faults and damage caused by failure to observe water quality in heating system see chap. no. 5.1 
and 6.3 or by using the anti-freeze mixture 

 

Faults caused by failure to observe instructions stated in this manual  

Every defect must be announced immediately after having been found out, always in writing and by 
an agreement made by telephone. 

 

If the above instructions are not observed then the manufacturer will not provide the guarantees. 

 

The manufacturer reserves the right to make changes within the product innovations that needn’t be 
included in this manual.  

Summary of Contents for G 50 Series

Page 1: ......

Page 2: ...allation 9 5 1 Rules and regulations 9 5 2 Positioning possibilities 11 6 Delivery and assembly 12 6 1 Delivery and accessories 12 6 2 Parts of boiler shell 12 6 3 Assembly procedure 13 7 Commissionin...

Page 3: ...pter no 9 Important warnings Please follow the under mentioned information and especially the prescribed annual check ups to be carried out an authorized firm in order to guarantee a long time and tro...

Page 4: ...mass without burner kg 165 216 270 319 367 Water space volume l 27 40 53 66 79 Diameter of smoke socket mm 130 130 150 150 150 Boiler dimensions height x width mm 785 x 600 length without burners mm...

Page 5: ...light number of sections 2 3 4 5 6 Boiler output kW 18 25 25 37 37 46 46 60 60 80 Recommended burner Bentone B 10 Bentone B 20 4 Description 4 1 Boiler construction The main part of the cast iron boi...

Page 6: ...fficiency are improved Tab no 5 Dislocation guide plates and turbulators Type of boiler G 50 2xxx G 50 3xxx G 50 4xxx G 50 5xxx G 50 6xxx Lower turbulator small 2 2 Lower turbulator big 2 2 4 guide pl...

Page 7: ...ion which reduces losses related to heat transfer into environment The boiler steel shell surface is painted by using a good quality comaxite paint Fig no 5 Flue gases turbulence in boiler drum 4 2 Co...

Page 8: ...tion pump run BT1 Safety thermostat BT2 Service thermostat BT3 Circulation pump thermostat MPH1 Service hours for 1 burner stage MPH2 Service hours for 2 burner stage KA1 Relay 2 of burner KA2 Relay o...

Page 9: ...testing and marking EN 303 2 Heating boilers Part 2 Heating boilers with forced draught burners Special requirements for boilers with atomizing oil burners EN 676 Automatic forced draught burners for...

Page 10: ...and solid fuel burning appliances having electrical connections EN 60445 ed 4 Basic and safety principles for man machine interface marking and identification Identification of equipment terminals con...

Page 11: ...terials of combustibility grade E F which quickly burn and burn themselves even after removal of ignition source such as paper cardboard asphalt and tar paper wood and wood fiber boards plastics floor...

Page 12: ...boiler drum can be handled by use of a hand pallet truck the boiler drum is put on a pallet or after the shells assembly there are installed the lifting lugs in the upper part of the boiler drum for i...

Page 13: ...it on the screw heads located in the upper section of shell side parts of the shell and fix by sliding backwards 12 Screw the upper rear part of the shell by means of 3 tapping screws to the upper par...

Page 14: ...burner with manual for burner operation and will ensure its guarantee and after guarantee repairs 2 Gas or furnace oil extra light TOEL connection to the burner and electric network 3 Boiler commissi...

Page 15: ...the dustiness the boiler must be put out of operation Even the partial impurities deposits on the burner will degrade the combustion process and threaten the economic and reliable boilers operation W...

Page 16: ...ulate the boilers thermal output 11 Instructions for product disposal after its service life VIADRUS a s is contractual partner of firm EKO KOM a s with client number F00120649 The packages comply wit...

Page 17: ...manufacturing factory The manufacturer requires for guarantee applicability In sense of Act no 222 94 Coll On business conditions and government administration in certified branches and on State elect...

Page 18: ...aging unit EN 13429 NO 3 1 Recovery by material recycling ensure recyclability in all terms of the standard for the functional packaging unit EN 13430 YES 3 2 Recovery in the form of energy ensure tha...

Page 19: ...months after the date it was dispatched from the manufacturing factory For boiler drum 5 years after the date its dispatch from the manufacturing factory The adjustment according to boiler operation...

Page 20: ...certificate for customer the user Record of accomplished guarantee and after guarantee repairs and regular product checpc Record date Carried out activity Contracting service organization stamp signa...

Page 21: ...ximum 30 months after the date it was dispatched from the manufacturing factory For boiler drum 5 years after the date its dispatch from the manufacturing factory The adjustment according to boiler op...

Page 22: ...22...

Page 23: ...m 30 months after the date it was dispatched from the manufacturing factory For boiler drum 5 years after the date its dispatch from the manufacturing factory The adjustment according to boiler operat...

Page 24: ...24 Date of revision 16 2013 model 2010 GB THERMODAL...

Reviews: