12
Boilers positioning with regard to the necessary handling space:
according to Fig. No. 8
Air supply demands:
Boiler must only be installed in a room with air supply according to EN 1775 - Gas supply - Gas
pipework for buildings - Maximum operating pressure less than or equal to 5 bar - Functional
recommendations.
6.
Delivery and assembly
6.1
Delivery and accessories
The boiler is delivered in a decomposed condition. The boiler drum is completed and fastened to a pallet. The
boiler shells, electric panel and burner are in separate cardboard boxes.
The boiler drum can be handled by use of a hand pallet truck (the boiler drum is put on a pallet) or after the
shells assembly there are installed the lifting lugs in the upper part of the boiler drum for its suspension.
6.2
Parts of boiler shell
1.
Part of the front shell
1 pc
2.
Lower part of the front part of the shell 1 pc
3.
Side part of the shell
2 pc
4.
Upper part of the shell
1 pc
5.
Rear upper part of the shell
1 pc
6.
Rear lower part of the shell
1 pc
7.
Shell console
4 pc
8.
Tapping screw 4,2x9
13 pc
9.
Screw M 5 x 10
8 pc
10. Insulation of the boiler body
1 pc
11. Insulation of the rear upper part of shell 1 pc
12. Insulation of the rear lower part of shell 1 pc
13. Shell handrail
2 pc
14. VIADRUS label
1 pc
Fig. no. 9
Boiler shell compostion