background image

 

10

 

Placement and installation  

6.1 

Regulations and guidelines 

a) for the heating system 
CSN 06 0310 

Heating systems in buildings – Design and installation 

CSN 06 0830 

Heating systems in buildings – Safety devices 

CSN 07 7401 

Water and steam for heating equipment with steam working pressure up to 8 MPa 

EN 15502-1 

Gas-fired central heating boilers - Part 1: General requirements and tests 

EN 15502-2-1  

Gas-fired  central  heating  boilers  -  Part  2-1:  Specific  standard  for  boilers  of  design  C  and 
designs B2, B3 and B5, with a nominal heat input not exceeding 1,000 kW 

EN 677 

Gas-fired  central  heating  boilers  –  Specific  requirement  for  condensing  boilers  with  a 
nominal heat input not exceeding 70 kW 

b) for chimneys 
CSN 73 4201 

Chimneys and flues – Design, implementation and connection of fuel appliances 

c) regarding the fire regulations 
CSN 06 1008 

Fire safety of heat installations. 

EN 13501 – 1 + A1 

Fire  classification  of  construction  products  and  building  elements – Part  1:  Classification 
using test data from reaction to fire tests 

d) for the system HW heating 
CSN 06 0320 

Thermal systems in buildings – Hot water preparation –Designing and Installation 

CSN 06 0830 

Heating systems in buildings – Safety devices 

CSN 75 5409 

Internal Water Supply 

e) for the electricity network 
CSN 33 0165 

Electrical  regulations.  Marking  the  conductors  with  colours  or  digits.  Implementing 
regulations. 

CSN 33 1500 

Electrical regulations. Revision of electrical devices. 

CSN 33 2000–1 ed. 2 

Low-voltage electrical installations – Part 1. Basic terms of determining the fundamental 
characteristics of the definition. 

CSN 33 2000–4–41 ed. 2  Low-voltage electrical installations – Part 4-41, Protective measures to ensure safety – 

Protection against electric shock 

CSN 33 2000-5-51 ed. 3 

Low-voltage  electrical  installations  –  Part  5-51.  Selection  and  erection  of  electrical 
equipment – Common rules. 

CSN 33 2000-7-703 ed.2  Electrical installations of buildings – Part 7-703: Requirements for special installations or 

locations – Rooms and cabins containing sauna heaters. 

CSN 33 2130 ed. 2 

Low-voltage electrical installations – Internal electric distribution lines. 

CSN 33 2180 

CSN  electric  engineering  regulations.  Rules  for  installation  of  electrical  apparatus  and 
appliances. 

Č

SN 34 0350 ed.2 

Safety requirements for flexible cords and cables. 

EN 60079-10-1 

Explosive  atmospheres  –  Part  10-1:  Classification  of  areas  –  Explosive  gas 
atmospheres. 

EN 60079-14 ed.3 

Explosive atmospheres – Part 14: Electrical installations design, selection and erection. 

EN 60335 – 1 ed.3 

Household and similar electrical appliances - Safety – Part 1: General requirements. 

EN 60335-2-102 

Household  and  similar  electrical  appliances  -  Safety  –  Part  2 – 102:  Particular 
requirements for gas, oil and solid-fuel burning appliances having electrical connections. 

EN 60 445 ed. 4  

Basic and safety principles for man-machine interface, marking of terminals of electrical 
equipment, ends of cables and wires. 

f) for the gas distribution  
EN 1775 

Gas  supply  –  Gas  pipework  for  buildings  –  Maximum  operating  pressure  <=  5  bar  – 
Functional recommendations. 

EN 12007-1 

Gas supply systems – Pipelines for maximum operating pressure up to and including 16 
bar – Part 1: General functional recommendations. 

EN 12007-2 

Gas supply systems – Pipelines for maximum operating pressure up to and including 16 
bar – Part 2: Specific functional requirements for polyethylene (MOP up to and including 
10 bar)  

EN 12007-3 

Gas supply systems – Pipelines for maximum operating pressure up to and including 16 
bar – Part 3: Specific functional requirements for steel.  

EN 12007-4 

Gas supply systems – Pipelines for maximum operating pressure up to and including 16 
bar – Part 4: Specific recommendations concerning reconstructions.  

CSN 07 0703 

 Boiler rooms with gas fuel-operated equipments 

CSN 38 6405 

Gas equipment, operation principles. 

Summary of Contents for CLAUDIUS K 2 Series

Page 1: ...VIADRUS CLAUDIUS K 2 Manual for boiler operation and installation GB_2016_35 GB_2016_43...

Page 2: ...m and filling with water 15 7 2 Gas connection 16 7 3 Connection to the mains 16 7 4 Condensate drain 16 7 5 Flue gas exhaust 16 7 6 Pressure losses of flue gas exhaust components for the boiler VIADR...

Page 3: ...for heating of houses recreation facilities and also for reconstruction of heat sources in individual flats Heat output of the condensing boiler is 3 8 to 24 kW K 2 L3X and 7 8 to 48 1 kW K 2 L5X The...

Page 4: ...condensate outlet mm 25 25 safety valve outlet Js 3 4 3 4 gas inlet Js 3 4 3 4 Supply voltage 1 N PE 230 VAC 50 Hz TN S Input power including pumps W 110 110 El protection IP 41 41 Tab 2 Heat technic...

Page 5: ...temperature mode 4 87 6 At 30 of rated heat output and low temperature regime P1 4 3 kW At 30 of rated heat output and low temperature regime 1 97 6 Consumption of auxiliary electrical power Other it...

Page 6: ...temperature mode 4 87 8 At 30 of rated heat output and low temperature regime P1 8 8 kW At 30 of rated heat output and low temperature regime 1 97 8 Consumption of auxiliary electrical power Other it...

Page 7: ...controlled equithermally it is necessary to connect the outdoor sensor In this case we recommend using one of the communication devices see chap 6 3 To increase the number of heating circuits expansio...

Page 8: ...is equipped with an additional anticorrosive device in the form of a magnesium anode whose function is based on the utilization of the electrochemical potential difference between the anode and the ta...

Page 9: ...entral heating circulation supply return pipeline R 3 4 E socket heating coil R 5 4 Sensor housing R 3 8 Thermometer internal thread 1 2 Water drain 3 4 Magnesium anode An stopper 2 Weight empty kg 57...

Page 10: ...Selection and erection of electrical equipment Common rules CSN 33 2000 7 703 ed 2 Electrical installations of buildings Part 7 703 Requirements for special installations or locations Rooms and cabins...

Page 11: ...ards wood and fibreboards plastics flooring materials the safe distance is doubled it means that the distance is 400 mm The safe distance is to be doubled also in case when the fire reaction class is...

Page 12: ...ng to the project K 2 L3X K 2 L5X L mm 502 587 L1 mm 213 5 293 5 L2 mm 105 5 183 5 V1 mm 426 440 diam D mm 80 110 Fig 6 Rear view of the boiler 1 Heating water outlet from the boiler if a water heater...

Page 13: ...mperature sensor input B9 External temperature sensor B38 HW temperature sensor input BTr Room thermostat E1 Kindling electrode E2 Monitoring electrode MV1 Fan MV1 Fan Q1 Pump X1a Power supply connect...

Page 14: ...ector 230 X1b Three way valve and selected output connector X1f Fan and pump power supply connector X2 Kindling transformer and gas valve connector X4 Temperature sensors and Reset button connector X5...

Page 15: ...ption Before filling the system with water shift a three way valve control lever into the intermediate position using a screwdriver or manually by pulling it toward yourself slightly down if the boile...

Page 16: ...he boiler commissioning check whether the condensate is drained Size of a waste PVC pipe is of 16 mm The condensate pH is 4 5 and it can be drained into the sewer system without treatment The boiler c...

Page 17: ...h a special liner intended for the condensation boiler and a condensate drain from the chimney For the boiler it is possible to use a plastic liner with the temperature resistance of 120 C Version C8...

Page 18: ...d calculation of the relevant flue gas exhaust 7 7 Boiler commissioning The entire installation must comply with regulations related to this equipment The boiler must be compatible with local connecti...

Page 19: ...the flue gas which must be in the range of 8 4 to 8 8 The recommended value is 8 5 7 Wait about 120 seconds until the boiler operation gets stabilized and check or adjust the CO2 max value using the C...

Page 20: ...e selected parameter value A B C H D E F G I J Fig 13 A Operation mode switch FV OFF ON for the HW heating B RESET button burner fault unblocking press for about 3 s C ESC button returning one step ba...

Page 21: ...s 1 Time 00 00 23 59 hh mm 1 Date 01 01 31 12 dd MM 5 Summer time start 25 03 01 01 31 12 dd MM 6 Summer time end 25 10 01 01 31 12 dd MM Current date and time must be set due to the correct function...

Page 22: ...0 00 00 24 00 hh mm 602 Mo Su 1 Phase OFF 22 00 00 00 24 00 hh mm 603 Mo Su 2 Phase ON 24 00 00 00 24 00 hh mm 604 Mo Su 2 Phase OFF 24 00 00 00 24 00 hh mm 605 Mo Su 3 Phase ON 24 00 00 00 24 00 hh m...

Page 23: ...Fig No 18 Summer winter automatic temperature limit for switching between summer and winter mode Req T Run up Room Thermostat the temperature to which the boiler will heat when the outside sensor is n...

Page 24: ...on In case of recurrence of the error contact service 8 5 Faults Fault Reason Solution The boiler does not ignite No voltage at the boiler Check whether the power cord is plugged in and whether there...

Page 25: ...hrough the burner chamber leave for 10 min and rinse with clean water Any impurities will be discharged through a siphon 10 Install the burner plate by means of 4 nuts and washers M6 connect the fan c...

Page 26: ...eriod it is necessary to add to the system a manufacturer approved antifreeze for this type of boiler or drain the system to avoid freezing of the heating system and the boiler For the boilers with fl...

Page 27: ...Performance of regular service inspections within the range specified by the manufacturer by a service company with a valid service certificate For an eventual housing complaint the customer is oblig...

Page 28: ...aging unit EN 13429 NO 3 1 Recovery by material recycling ensure recyclability in all terms of the standard for the functional packaging unit EN 13430 YES 3 2 Recovery in the form of energy ensure tha...

Page 29: ...nty certificate for customer user A record of warranty and after warranty repairs and regular annual product inspections Record date Carried out activity Contracting service organization signature sta...

Page 30: ...30...

Page 31: ...31...

Page 32: ...VIADRUS CLAUDIUS K 2 VIADRUS a s Bezru ova 300 E mail CZ 735 81 Bohum n info viadrus cz www viadrus cz...

Reviews: