40 Chapter 3 Installation
NetSure 801 CA7 Power Supply System (New Skelecton) User Manual
3.3 Installation Checklist
Aft er installation, security check should be conducted using the checklist shown in Table 3-2.
Table 3-2 Installation checklist
No
Standards and requirements
Pass
Notes
1
Constructed according to the design plan
Yes/No
2
The system cabinets are fixed with expansive screws
Yes/No
3
The cabinets are aligned
Yes/No
4
The installation equipment is clean
Yes/No
5
The installation equipment facilitates wiring
Yes/No
6
Cable wiring is covert
Yes/No
7
Cable is wired with consideration of the wiring of other systems
Yes/No
8
Cable pipe is laid in cable trenching
Yes/No
9
Cable labels are clear and accurate
Yes/No
10
Connector coat peeling is tidy and consistent
Yes/No
11
Type O or U terminal is used for the connection of signal lines
Yes/No
12
Cable lug is reasonably used in cable connection
Yes/No
13
SPD earth, DC power earth and protective earth are connected correctly
Yes/No
14
Leeway is left for the length of connection cable and the cable wiring is covert
Yes/No
15
The cable lugs and cable connectors are well connected
Yes/No
16
The screws in all cable connection points are firmly fixed
Yes/No
17
The original environment is restored which has been destroyed due to the construction
Yes/No
18
Scratch traces by marking pencils are left on the equipment
Yes/No
19
The busbar connection on the rack top for connection of parallel cabinets is up to requirements
Yes/No
20
The cables and cable trenching are level horizontally or vertically.
Yes/No
21
Distances between line cable ties are equal and consistent
Yes/No
22
Leeway is left in cable trenching
Yes/No
23
Separation measures are taken in cross wiring
Yes/No
24
Wiring is far from high temperature equipment and corrosive liquid pipe
Yes/No
25
Wiring on wiring rack is in accordance with the original wiring style
Yes/No
26
DC distribution branches and fuses are properly selected according to the corresponding loads
Yes/No
27
Surplus parts of the cable ties are left uncut
Yes/No
28
The placement of the equipment facilitates cabinet expansion and maintenance
Yes/No
29
The cabinet assembly is well-fixed and quakeproof-handled
Yes/No
30
Paint and galvanized layer on the cabinet are not peeled
Yes/No
31
No crumple or crack at the turning points of bus
Yes/No
32
For rectifier cabinet Rack2000-7, check that 2-route AC input is available.
Yes/No
3.4 Installing Rectifier And Controller
System assembly involves the installation of rectifier and controller.
3.4.1 Installing Rectifier
The installation steps of rectifier are as following:
1. Place up the slide switch of the rectifier, and push the rectifier into the corresponding position in the rectifier cabinet
(do not push it inward completely), as shown in Figure 3-22 (a).
2. Place down the slide switch, and then push the rectifier to the back until the rectifier panel is level with the rectifier
cabinet panel, as shown in Figure 3-22 (b).
3. Tighten the bolts on the handle to fix the rectifier on the rack, as shown in Figure 3-22 (c) and Figure 3-22 (d).