4. Lift the unit 24" (610mm) off the top deck of the skid.
5.
Remove the skid from under the unit.
6. To rotate the unit, a mechanized method is recommended, but if one is not available, use a minimum of four
properly-protected individuals to rotate the elevated unit 90 degrees so the unit legs are pointing toward the
ground, Figure 4.5 below.
7.
Set the upright unit on the ground so the legs support unit weight.
8.
Remove the straps from around unit.
Figure 4.5 Rotate and Set Drycooler on Ground or Level Surface
4 Equipment Inspection and Handling
23
Summary of Contents for Liebert Drycooler
Page 1: ...Liebert Air cooled Direct drive Drycooler Installer User Guide 50 Hz and 60 Hz ...
Page 10: ...Vertiv Liebert Drycooler Installer User Guide 6 This page intentionally left blank ...
Page 20: ...Vertiv Liebert Drycooler Installer User Guide 16 This page intentionally left blank ...
Page 24: ...Figure 4 2 Removing Protective Material Vertiv Liebert Drycooler Installer User Guide 20 ...
Page 34: ...Vertiv Liebert Drycooler Installer User Guide 30 This page intentionally left blank ...
Page 54: ...Vertiv Liebert Drycooler Installer User Guide 50 This page intentionally left blank ...
Page 62: ...Vertiv Liebert Drycooler Installer User Guide 58 This page intentionally left blank ...
Page 66: ...Vertiv Liebert Drycooler Installer User Guide 62 This page intentionally left blank ...
Page 68: ...Vertiv Liebert Drycooler Installer User Guide 64 This page intentionally left blank ...
Page 101: ...Vertiv Liebert Drycooler Installer User Guide ...