background image

Vertiv | VE Series Rack | User Manual

 

Pre-Installation Preparation

 

 

 

 

Model

 

 

Frame

 

 

Beam

 

EIA

 

Rails

 

Side 

Panel

 

Top 

Cover

 

Front 

Door 

(mesh)

 

Rear Door 

(mesh)

 

Bottom 

Panel

 

PDU/Cable 

Management 

Bracket

 

SR-V061220SF

 

2

 

4

 

4

 

4

 

1

 

1

 

2

 

NA

 

2

 

SR-V061220SA

 

2

 

4

 

4

 

4

 

1

 

1

 

2

 

NA

 

2

 

SR-V061222SF

 

2

 

6

 

4

 

4

 

1

 

1

 

2

 

NA

 

2

 

SR-V061222SA

 

2

 

6

 

4

 

4

 

1

 

1

 

2

 

NA

 

2

 

SR-V081120SF

 

2

 

4

 

4

 

4

 

1

 

1

 

2

 

NA

 

2

 

SR-V081120SA

 

2

 

4

 

4

 

4

 

1

 

1

 

2

 

NA

 

2

 

SR-V081122SF

 

2

 

6

 

4

 

4

 

1

 

1

 

2

 

NA

 

2

 

SR-V081122SA

 

2

 

6

 

4

 

4

 

1

 

1

 

2

 

NA

 

2

 

SR-V081220SF

 

2

 

4

 

4

 

4

 

1

 

1

 

2

 

NA

 

2

 

SR-V081220SA

 

2

 

4

 

4

 

4

 

1

 

1

 

2

 

NA

 

2

 

SR-V081222SF

 

2

 

6

 

4

 

4

 

1

 

1

 

2

 

NA

 

2

 

SR-V081222SA

 

2

 

6

 

4

 

4

 

1

 

1

 

2

 

NA

 

2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Summary of Contents for 01230840

Page 1: ...ides customers with technical support Users may contact the nearest Vertiv local sales office or service center Copyright 2019 by Vertiv Co Ltd All rights reserved The contents in this document are su...

Page 2: ...d in this document may not be within the purchasing scope or the usage scope Unless otherwise specified in the contract all statements information and recommendations in this document are provided AS...

Page 3: ...ates instructions that need to be adhered to failing which may result in danger and safety issues thereby having an adverse effect on the reliability of the device and security Even for practices not...

Page 4: ...aration 8 2 1 Installation Tools 8 2 2 Threaded Accessories 9 2 3 Transportation 9 2 4 Unpacking 11 2 5 Equipment Room Requirements 15 Chapter 3 Installation Instructions 16 3 1 Adjusting the EIA Rail...

Page 5: ...g the Feet and Leveling the Rack 29 3 10 Removing the Feet and Casters optional 30 3 11 Baying the VE Rack 30 3 12 Installing and Removing the Floating Nut 32 3 13 Fixing the Rack on the Floor 33 3 14...

Page 6: ...ta internet network equipment UPS and batteries etc which are used in indoor environments such as data centers or computer rooms This chapter introduces model description specifications features appea...

Page 7: ...50 SR V061220SA 600x1200x2000 42U 01230851 SR V061222SA 600x1200x2253 48U 01230852 SR V081120SA 800x1100x2000 42U 01230853 SR V081122SA 800x1100x2253 48U 01230854 SR V081220SA 800x1200x2000 42U 012308...

Page 8: ...llent Function Front and rear door integrated bending forming beautiful durable high rigidity and strength Dynamic load 1000kg Static load 1600kg Front and rear door through hole rate of 75 to meet th...

Page 9: ...Appearance and Components Diagram The rack is mainly composed of the following components 1 Rear Door 2 PDU Cable Management Bracket 3 Side Panels 4 Top Cover 5 Frame 6 EIA Rails 7 Front Door 8 Bottom...

Page 10: ...SR V061220SF 2 4 4 4 1 1 2 NA 2 SR V061220SA 2 4 4 4 1 1 2 NA 2 SR V061222SF 2 6 4 4 1 1 2 NA 2 SR V061222SA 2 6 4 4 1 1 2 NA 2 SR V081120SF 2 4 4 4 1 1 2 NA 2 SR V081120SA 2 4 4 4 1 1 2 NA 2 SR V0811...

Page 11: ...ut Hook Other Installation Tools user owned The schematic diagram of the other installation tools is shown in Figure 2 2 and its usage purpose is mentioned in Table 2 1 Utility Knife Phillips Screwdri...

Page 12: ...r equipment installation Floating nut Used in conjunction with M6 screws for equipment installation M5 Sinking head screw Used to secure rack parts in a rack 2 3 Transportation Rail road and shipping...

Page 13: ...hanical Handling Tools When handling and unloading with an electric forklift it is recommended that the fork to be in the center of gravity position to prevent dumping When handling ensure that the ma...

Page 14: ...ck are fixed in the same ways on the pallets by using pallet fixtures Pallet disassembly for Racks with castors and feet Loosen the M6 combination screws and M10 bolts on the pallet fixture with a hex...

Page 15: ...screws in the front and rear Fixing screw 4 pcs A A amplified Pallet Overlook Figure 2 9 Pallet Disassembly Diagram 2 As shown in Figure 2 10 VE series racks are equipped with four M12 hoisting thread...

Page 16: ...Rack User Manual Pre Installation Preparation Hoisting threaded hole 1 Hoisting threaded hole 4 Hoisting threaded hole 2 Hoisting threaded hole 3 Figure 2 10 Rack Hoisting Hole Pallet Figure 2 11 Rem...

Page 17: ...ough its casters Move the rack from its front or rear I fmoving the rack from its side the rack may have the risk of toppling over By default the feet adjustment in VE series rack at factory is at the...

Page 18: ...ck the specific installation design should be based on the air conditioner system and air duct circulating system in the equipment room 135 135 135 1615mm 2373mm Figure 2 13 Space required to open the...

Page 19: ...djusted according to the equipment requirements Table 3 1 Factory Mounting Position of the EIA Rail Rack Width W x Depth D mm Distance between front rail and inner surface of front door panel mm Front...

Page 20: ...ng the same method as mentioned in step 1 so that the left front EIA rail is aligned with the right front EIA rail as shown in Figure 3 2 the mounting hole spacing on the crossbeam is 12 5mm and the s...

Page 21: ...PDU Cable Management Bracket available Width As shown in Figure 3 3 the PDU Cable management bracket is 140mm wide and its adjustment mode is consistent with the EIA rail adjustment mode 3 3 Removing...

Page 22: ...ch of side panel Figure 3 4 Side Panel Disassembly 2 Pull the top of the side panel outwards from the rack frame as shown in Figure 3 5 and lift it up toremove the side panel 1 2 Side panel Figure 3 5...

Page 23: ...n Figure 3 6 1 2 Side panel Figure 3 6 Side Panel Mounting 2 Toggle the latch in the direction of the arrow as shown in Figure 3 7 push the top of the side panel forward until the latch on both sides...

Page 24: ...2 4 0 100 6 6 100 100 240 100 6 6 1 0 0 2 4 0 Front of rack Rear of rack Top cover of 600mm rack Front of rack Back of rack Top cover of 600mm rack Figure 3 8 Top Cover Cabling Hole Size Removing the...

Page 25: ...free disassembly of the top cover When mounting the top cover as shown in Figure 3 11 insert the top cover in the frame with slight jerk to the spring loaded plunger and pull the top cover downwards...

Page 26: ...ws to fix them on the guide rails as shown in Figure 3 12 Slide bottom panel Guide rail Self tapping of M5 A A amplified Figure 3 12 Bottom Panel Adjustment The bottom panel is divided into three segm...

Page 27: ...t door Door Lock Operation Method The door lock has a handle and a keyhole as shown in Figure 3 14 Handle Key hole Figure 3 14 Door Lock Open Door Method 1 Insert the key into the keyhole 2 Rotate the...

Page 28: ...User Manual the schematic diagram after installation is shown in Figure 3 15 Figure 3 15 Intelligent Door Lock Installation 3 7 Rack Grounding Points Grounding Wire The grounding wire of the VE serie...

Page 29: ...ints of front door Grounding points of frame Grounding points of front door Figure 3 17 Grounding Points of Frame and Front Door When the rear door is grounded with the frame the two rear doors to the...

Page 30: ...g but its grounding line installation location is different 600mm wide rack side door grounding position is located on both sides of the rear end of the rack 800mm wide rack side door grounding positi...

Page 31: ...cted with the crossbeam grounding wire the grounding position is identical 3 8 Rack Main Grounding Points The rack is provided with both front and rear main grounding points inside the lower width bea...

Page 32: ...inner hexagon hole of the feet see Figure 3 21 2 Rotate the inner hexagonal wrench to raise or lower the feet as shown in Figure 3 21 Inner hexagon spanner User prepared Feet Figure 3 21 Adjusting Mo...

Page 33: ...hexagonal bolt from each caster with a socket wrench and then removethe caster Disassembly of Feet 1 Loosen the fastening nut with an active wrench clockwise on four feet screws 2 Turn the hexagonal...

Page 34: ...e frame of rack 1 using the M5 countersunk head screw as shown in Figure 3 23 A B M5 countersunk head screw Baying kits A amplified B amplified M5 countersunk head screw Baying kits Figure 3 23 Instal...

Page 35: ...g the Front and Rear Door use the M5 sinking head screws to secure the rack to Rack 2 3 Install the right rear door of Rack 2 after baying the rack Rack2 Rear door A B Baying Kits Rear doorRack1 A amp...

Page 36: ...square hole The removal steps for floating nuts are as follows 1 Remove the screws mounted on the floating nut 2 Squeeze the sides of the floating nut by hand to remove it from the square hole 3 13 Fi...

Page 37: ...the content of the toxic and hazardous substance in at least one of the average quality materials of the part is outside the limits specified in SJ T 11363 2006 Vertiv Co Ltd has been committed to th...

Page 38: ...are trade names trademarks or registered trademarks of their respective owners While every precaution has been taken to ensure accuracy and completeness herein Vertiv Co Ltd assumes no responsibility...

Reviews: