Installation Instructions
•
The left and right EIA rails of the rack must be aligned in order to install the user device.
•
2200mm height rack have three adjustment pieces per EIA rail.
•
Use EIA rail adjustment and M5 combination screws to secure the medium and lower EIA rails.
3.2.
Adjusting PDU/Cable Management Bracket (optional)
140mm
Figure 3-3 PDU/Cable Management Bracket available Width
As shown in
Figure 3-3
, the PDU/Cable management bracket is 140mm wide, and its adjustment mode is consistent with
the EIA rail adjustment mode.
3.3.
Removing and Replacing the Side Panel (optional)
Removing the Side Panel
•
Remove the front door, if the side panel has been connected to the crossbeam with grounding wire,
firstly disconnect the grounding wire.
The steps of removing the side panel are as follows:
1.
Use the key to twist the lock core to the open position, as shown in
Figure 3-4
, and toggle the latch inwards
with your finger.