Chapter 3 Installation 25
SmartCabinet Series Solution Product for IDC or Computer Rooms User Manual
Figure 3-17 Condensate water pipe location
3.6 Checklist after Installation
After installing the indoor and outdoor units of air conditioning and completing all necessary mechanical connections,
check and verify according to Table 3-6.
Table 3-6 Checklist
Item
Conclusion
Reserve adequate maintenance space
Verify that all connections are reliable
Verify that the air conditioning equipment is placed in the right direction to ensure that the cold air enters the
cabinet cold passage from the front outlet, and the hot air in the hot passage returns to the indoor air conditioning
unit from the back outlet.
Ensure that foreign objects inside and around the equipment are removed (e.g. transport components, dismantled
installation accessories, installation tools, etc.)
Correct installation of condensate drainage pipe
All pipes and joints are securely fixed
All pipe joints and fasteners are tightly fixed.
3.7 Installing Air Duct Optional Parts (optional)
When selecting the SmartCabinet 600mm wide integrated unit, if the heat in the cabinet cannot be dissipated to
outside of the cabinet, you can install an air duct on site to exhaust the hot air to outdoor. The air duct optional parts
can be selected for the system to meet the requirement for connecting the air duct to the cabinet in field installation.
First, the installation mode of the air duct parts used in integrated unit is introduced as follows.
1. Remove the M4X10 screw (1PCS), push upward the original perforated board at the air outlet of the top frame
body, remove the perforated board as shown in Figure 3-18.
A
A amplified
Drain pipe
Hose barb