To connect the power cables
1
Refer to the following section for a description of C-13/C-14 and C-19/C-20
power cable connectors as needed.
See
on page 18.
2
Verify that the AC power supply input for the compute node is within one of
these ranges:
■
100 - 127 VAC at 50/60 Hz, 8.2 A
■
200 - 240 VAC at 50/60 Hz, 4.4 A
3
Verify that the AC power supply input for the storage shelves is within the range
of 200 - 240 VAC at 50/60 Hz, 9.13 - 10.95 A.
4
For each component, obtain two power cords that are appropriate for your
region and equipment.
5
On the compute node, connect a power cord to each power supply socket.
Connect the other end of each cord to a different PDU.
6
On the Primary Shelf, connect a power cord to each power supply socket.
Connect the other end of each cord to a different PDU.
See
“Turning on the hardware and verifying operation”
on page 45.
44
Installation procedures
Connecting the power cords to the hardware