7
On the front right panel of the compute node, press the power button to turn
on the compute node.
8
After a few minutes, verify that the compute node has fully initialized as follows:
■
On the right front panel of the compute node, locate the triangular Status
LED near the top of the LED panel. The LED should be green during normal
operations.
■
Verify that the disk drive LEDs have initialized properly as follows:
The Status LED (1) should not be lit. The following indications are also
possible:
■
A solid, amber, LED indicates a disk fault.
48
Installation procedures
Turning on the hardware and verifying operation