
■
A blinking, amber LED indicates that a RAID rebuild is in progress.
The Activity LED (2) indicates the following:
■
The LED is not lit when the disk has spun down, although power is still
on.
■
The LED is solid green when there is no disk activity, although power
is still on.
■
The LED blinks green when the disk spins up.
■
The LED blinks green occasionally when commands are processed.
9
Proceed to configuring the IPMI port and enabling access to the Veritas Remote
Management Console.
See
“About the Veritas Remote Management Console on the Velocity physical
on page 50.
49
Installation procedures
Turning on the hardware and verifying operation