02041802-05
Veraz Networks Inc. Proprietary
6-1
Installing the Chassis
Installing the Chassis
Installing the Chassis
Installing the Chassis
If the chassis is not already installed in the cabinet, follow the instructions below. If
you are installing a chassis into an ETSI, 45U-54U or 19in./47U cabinet, the cabinet
must first be bolted to the floor (see Chapter 5, "Cabinet Installation").
The procedure for mounting the chassis is the same for both the ETSI, 45U-54U and
19in./47U cabinet, except that the mounting kit is different (see Section 6.1
"Mounting Kit", page 6-2). The chassis can also be installed into a NEBS cabinet.
The cabinet can be fitted with up to three terminal chassis. However, only the two
upper terminals are fitted with an air baffle (see Figure 3-2).