Pre-towing and Work Site Inspections
Give us your thoughts
6
PCMS Operations, Safety & Maintenance V2
Ver-Mac 2019
2 Pre-towing and Work Site Inspections
These preliminary inspections help to ensure that:
•
the installation site is suitable
•
the general condition of the PCMS unit structure is solid
•
the unit components are all well secured
•
the braking and lighting systems are operational
2.1 Walk-Around Inspection of PCMS Unit
The walk-around inspection aims to catch any obviously out-of-place conditions that
could potentially affect safety and unit operations.
Always carry out a walk-around inspection of your PCMS unit:
•
Before moving the unit to the worksite.
•
Before removing the unit from a work site.
•
Periodically during long-term storage of the unit.
Make the walk-around inspection part of your pre-towing routine and have the
defects fixed
BEFORE
going on the road.
NOTE
A walk-around inspection only covers items that can be checked without getting
under the trailer.
Summary of Contents for PCMS-1500
Page 6: ......