SECTION
DATE
SUPERSEDES
TITLE
ET6K & LARGER CRANES
C200
02-21-14K
12-26-13J
WIRE ROPE INSTALLTN
22245
®
VENCO VENTURO INDUSTRIES LLC
CINCINNATI, OHIO
WIRE ROPE INSTALLATION
M
U
R
D
N
O
I
T
A
T
O
STEP 1:
UNWIND COIL OF WIRE ROPE BY 'ROLLING' ALONG THE FLOOR. THIS WILL
PREVENT 'KINKING'.
STEP 2:
INSERT WIRE ROPE END UP THROUGH ANTI-2-BLOCK (A2B) CAGE ASSEMBLY,
BETWEEN CHEEK PLATES, OVER THE TOP SHEAVE, AND THROUGH WIRE
ROPE GUIDE.
STEP 3:
INSERT WIRE ROPE END INTO POCKET OPENING ON WINCH, WRAP AROUND
WEDGE, AND BACK THROUGH POCKET OPENING AS SHOWN IN FIGURE 1.
CAUTION
!
·
IF THE WIRE ROPE IS NOT
INSTALLED FOR THE
CORRECT DRUM ROTATION,
THE WINCH BRAKE VALVE
WILL NOT HOLD THE LOAD.
CAUTION
!
·
THERE MUST ALWAYS BE AT
LEAST [5] DEAD WRAPS OF
WIRE ROPE ON THE WINCH
DRUM WHILE UNDER LOAD.
NOTE:
SOME WINCHES MAY BE SUPPLIED WITH A HEX NUT IN LIEU OF A WEDGE FOR
INSTALLING THE WIRE ROPE.
FIG. 1
R
Summary of Contents for HT45KX-25
Page 2: ......
Page 4: ...SECTION 100 DESCRIPTION SPECIFICATIONS 7607100A ...
Page 8: ...SECTION 150 SAFETY 8604150 ...
Page 18: ...SECTION 200 INSTALLATION 7607200A ...
Page 34: ...SECTION 300 MAINTENANCE SERVICE 7607300A ...
Page 37: ...SECTION 400 PARTS 7607400A ...
Page 59: ......