
86
Figure 10.4: Proper Installation of Header Sensor
X. W
iring
(continued)
From System
To
System
Heating Circulators
DETAIL B SCALE 1 : 4
Header Temperature Sensor (Honeywell 32003971-003)
Well Should Extend Into Header Flow As Far As Possible. Use Extension
Only If Necessary.
Close Nipple
(Locate Header Sensor
As Close As Possible To Downstream Tee
Downstream Primary/Secondary Tee
Honeywell
Immersion Well
Summary of Contents for Raptor RPTR155
Page 1: ...1 ...
Page 13: ...13 Figure 5 1 Wall Layout Mounting Hole Location V Mounting The Boiler continued ...
Page 87: ...87 Figure 10 5 Internal Wiring Ladder Diagram X Wiring continued ...
Page 88: ...88 X Wiring continued ...
Page 97: ...97 Operating Instructions XI Start Up and Checkout continued ...
Page 148: ...148 XV Repair Parts continued 6D 6B 6A 6E 6I 6G 6L 6N 6H 6C 6K 6M 6C 6C 6J 6J 6F All Models ...
Page 172: ...172 ...