
27
VII. Venting
B. Design Requirements Unique to Horizontal Twin Pipe Venting Systems (continued)
Note:
Air intake termination not shown, refer to
Venting Section in Installation Instructions
supplied with the boiler
.
Figure 7.1
1: Location of V
ent T
erminal Relative to W
indows, Doors, Grades, Overhangs, Meters and Forced
Air Inlets - T
wo-Pipe System V
ent
Terminal (Shown) T
wo-Pipe System
Air Intake T
erminal (Not Shown)
Summary of Contents for Raptor RPTR155
Page 1: ...1 ...
Page 13: ...13 Figure 5 1 Wall Layout Mounting Hole Location V Mounting The Boiler continued ...
Page 87: ...87 Figure 10 5 Internal Wiring Ladder Diagram X Wiring continued ...
Page 88: ...88 X Wiring continued ...
Page 97: ...97 Operating Instructions XI Start Up and Checkout continued ...
Page 148: ...148 XV Repair Parts continued 6D 6B 6A 6E 6I 6G 6L 6N 6H 6C 6K 6M 6C 6C 6J 6J 6F All Models ...
Page 172: ...172 ...