![Veit Brisay BRI-7570/101 FPD Instruction Manual Download Page 36](http://html1.mh-extra.com/html/veit-brisay/bri-7570-101-fpd/bri-7570-101-fpd_instruction-manual_3856493036.webp)
Commissioning
32
BRI-7570_020
14.02.11
5.3.1. Setting instructions suction valve (option)
Setting must only be carried out by a
qualified person
(defini-
tion see chapter 2.4). This person must make sure that it is not
possible to start the machine when setting it.
Ill. 10, Suction valve (1-stage)
1. Release check nut (Pos. 1).
2. Turn setting screw (Pos. 2):
-
to the
right
to
reduce
the amount of suction,
-
to the
left
to
increase
the amount of suction.
3. Tighten check nut (Pos. 1).
1
2
Summary of Contents for BRI-7570/101 FPD
Page 10: ...Scope of delivery 6 BRI 7570_020 14 02 11 ...
Page 18: ...Safety tests 14 BRI 7570_020 14 02 11 ...
Page 24: ...Disconnect procedures 20 BRI 7570_020 14 02 11 ...
Page 54: ...Maintenance and inspection table 50 BRI 7570_020 14 02 11 ...
Page 60: ...Emergency 56 BRI 7570_020 14 02 11 ...
Page 62: ...Dismantling Disposal 58 BRI 7570_020 14 02 11 ...
Page 67: ...EC declaration of conformity 14 02 11 BRI 7570_020 63 13 EC DECLARATION OF CONFORMITY ...
Page 68: ...EC declaration of conformity 64 BRI 7570_020 14 02 11 ...