![Veit Brisay BRI-7570/101 FPD Instruction Manual Download Page 29](http://html1.mh-extra.com/html/veit-brisay/bri-7570-101-fpd/bri-7570-101-fpd_instruction-manual_3856493029.webp)
Unloading and transport to the place of installation
14.02.11
BRI-7570_020
25
Transport by crane
Ill. 5, Transport by crane
•
Push the transport aides through the provided bore holes
(see Ill. 4).
•
Fasten the ropes to the transport aides (see Ill. 5).
•
Lift the machine and transport it to the place of installation.
X
X
X
Summary of Contents for BRI-7570/101 FPD
Page 10: ...Scope of delivery 6 BRI 7570_020 14 02 11 ...
Page 18: ...Safety tests 14 BRI 7570_020 14 02 11 ...
Page 24: ...Disconnect procedures 20 BRI 7570_020 14 02 11 ...
Page 54: ...Maintenance and inspection table 50 BRI 7570_020 14 02 11 ...
Page 60: ...Emergency 56 BRI 7570_020 14 02 11 ...
Page 62: ...Dismantling Disposal 58 BRI 7570_020 14 02 11 ...
Page 67: ...EC declaration of conformity 14 02 11 BRI 7570_020 63 13 EC DECLARATION OF CONFORMITY ...
Page 68: ...EC declaration of conformity 64 BRI 7570_020 14 02 11 ...