![Veit Brisay BRI-7570/101 FPD Instruction Manual Download Page 25](http://html1.mh-extra.com/html/veit-brisay/bri-7570-101-fpd/bri-7570-101-fpd_instruction-manual_3856493025.webp)
Delivery
14.02.11
BRI-7570_020
21
4. TRANSPORT AND PACKING
Although machines of BRISAY-Maschinen GmbH are carefully
checked and packed before being delivered, damages during
transport may not be ruled out.
4.1. DELIVERY
(also applies to spare parts and return parts)
Receiving inspection
-
Check delivery for completeness using the delivery note!
-
Check delivery for damages (visual inspection).
Objections
Should the goods have been damaged during transport
-
contact the carrier immediately and
-
keep the packing (for a possible examination by the carrier
or for return shipment)!
Packing for return shipment
Use the original packing and the original packing material, if
possible.
If both cannot be used
-
engage a packing company with qualified staff,
-
place the machine on a pallet and fasten it with a securing
device. (The pallet has to be designed for the weight of the
machine.)
For questions on packing and securing devices, please contact
Kannegiesser Garment & Textile Technologies GmbH & Co..
Add desiccants when packing electric parts.
Land shipment
The machine will be delivered by truck or train.
Summary of Contents for BRI-7570/101 FPD
Page 10: ...Scope of delivery 6 BRI 7570_020 14 02 11 ...
Page 18: ...Safety tests 14 BRI 7570_020 14 02 11 ...
Page 24: ...Disconnect procedures 20 BRI 7570_020 14 02 11 ...
Page 54: ...Maintenance and inspection table 50 BRI 7570_020 14 02 11 ...
Page 60: ...Emergency 56 BRI 7570_020 14 02 11 ...
Page 62: ...Dismantling Disposal 58 BRI 7570_020 14 02 11 ...
Page 67: ...EC declaration of conformity 14 02 11 BRI 7570_020 63 13 EC DECLARATION OF CONFORMITY ...
Page 68: ...EC declaration of conformity 64 BRI 7570_020 14 02 11 ...