  Introduction

This manual contains installation procedures for the TLS2 to TLS2P upgrade. 

Contractor Certification Requirements

Veeder-Root requires the following minimum training certifications for contractors who will install and setup the 
equipment discussed in this manual:

Installer (Level 1) Certification:

 Contractors holding valid Installer Certification are approved to perform wiring 

and conduit routing; equipment mounting; probe, sensor and carbon canister vapor polisher installation; wireless 
equipment installation; tank and line preparation; and line leak detector installation.

TLS-350 Technician (Level 2/3 or 4) Certification:

 Contractors holding valid TLS-350 Technician 

Certifications are approved to perform installation checkout, startup, programming and operations training, system 
tests, troubleshooting and servicing for all Veeder-Root TLS-300 or TLS-350 Series Tank Monitoring Systems, 
including Line Leak Detection and associated accessories.

Warranty Registrations

 

may only be submitted by selected distributors.

Related Manuals

577013-959

TLS2P Site Prep and Installation Manual

577013-960

TLS2P Setup & Operators Manual

Summary of Contents for TLS2

Page 1: ...Manual No 577013 983 Revision B Upgrade Guide TLS2 to TLS2P...

Page 2: ...r Terms and Conditions VEEDER ROOT S PREFERRED CARRIER 1 Contact Veeder Root Customer Service at 800 873 3313 with the specific part numbers and quantities that were missing or received damaged 2 Fax...

Page 3: ...kit 3 Procedure 3 Figures Figure 1 Removing TLS2 Console Door 3 Figure 2 Disconnecting the display assembly from the CPU board 4 Figure 3 Removing the display 5 Figure 4 Attaching the new CPU board in...

Page 4: ...por polisher installation wireless equipment installation tank and line preparation and line leak detector installation TLS 350 Technician Level 2 3 or 4 Certification Contractors holding valid TLS 35...

Page 5: ...id damage to equipment property envi ronment or personal injury STATIC SENSITIVE COMPO NENTS Wear grounded anti static wrist strap before handling the printed circuit board READ ALL RELATED MANUALS Kn...

Page 6: ...rs to fit T 10 and T 15 screws PROCEDURE Figure 1 Removing TLS2 Console Door 983 1 eps 2 3 1 1 2 Shut off tag and lockout power to the TLS2 Console 1 Remove and retain the top and bottom T 15 shoulder...

Page 7: ...1 Remove and retain the four T 10 screws spacers and washers items1 and 2 in Figure 2 attaching the display to the CPU board Retain the two shorter screws 0 5 long item 2 in Figure 2 and all of the wa...

Page 8: ...d wire saddle clamp on the inner door item 3 in Figure 3 3 Remove the ribbon cable from its connector on the edge of the CPU board item 4 in Figure 3 Notice the orientation of the ribbon cable in the...

Page 9: ...from its packing and push the ground cable and ribbon cable through the right side opening in the inner door assembly and place the inner door assembly on the console and screw in the two right side...

Page 10: ...rd items 1 and 2 in Figure 2 2 Get the display and attach its 2 wire cable plug to the connector on the CPU board item 1 in Figure 5 3 Push the display s ribbon cable into its connector on the CPU boa...

Page 11: ...T 15 torx shoulder screws and the new TLS2P door 2 Position the door over the left holes in the top and bottom of the console and screw in the two shoulder screws item 1 in Figure 6 3 Loosen the groun...

Page 12: ...ic preventing grounding strap from the inner door Remove the two right T 15 torx screws holding on the inner door item 1 Figure 6 close the new outer door reinsert the two shoulder screws in the two h...

Page 13: ...For technical support sales or other assistance please visit www veeder com...

Reviews: