Pax-i3D Smart(PHT-30LFO) Installation Manual
32
3 Before Installing the System
3.2
Checking the ShockWatch and TiltWatch Indicators
This equipment is carefully inspected and packed prior to shipment. Nevertheless, the recipient of this
equipment should carry out a visual inspection of all packages before opening them in order to ensure
that the equipment was not damaged during shipping.
The installers and/or supervisor should check the status indicators on
each package before opening the package.
The ShockWatch and TiltWatch indicators become red if the package
has suffered any physical impacts during transportation. However, a red
indicator does not necessarily mean that the unit has been damaged.
These indicators are affixed only on the main box, which contains the
equipment very sensitive to external impacts
Check the followings before opening each package:
1.
These indicators are affixed only on the main box, which contains the equipment very sensitive to
external impacts
2.
Check the packaging for signs of damage visually.
3.
Locate the ShockWatch and TiltWatch indicators and check if they have been activated.
If either the packaging is damaged or the
ShockWatch
or
TiltWatch
indicators have been
activated, please do not open the package and immediately contact the shipping company, agent or
VATECH
.
TiltWatch
Summary of Contents for PaX-i3D Smart
Page 1: ...PHT 30LFO HARDWARE and SOFTWARE E n g l i s h Installation Manual Version 1 0 0...
Page 2: ......
Page 3: ......
Page 72: ...This page is intentionally left blank...
Page 82: ...This page is intentionally left blank...
Page 92: ...This page is intentionally left blank...
Page 137: ...10 Technical Specifications...
Page 145: ...Pax i3D Smart PHT 30LFO Installation Manual 145 Appendix Schematic diagram Components supplied...
Page 160: ......
Page 161: ...13 Samsung 1 ro 2 gil Hwaseong si Gyeonggi do Korea Postal Code 445 170...