Pax-i3D Smart(PHT-30LFO) Installation Manual
149
Appendix
Determining the height
1. Determine the screw height using the following formula.
h
screw height
=
100mm - d
• 100mm: the minimum desired distance between ceiling and the top of the equipment when the column
is fully extended
• d = H ceiling - H Max = H ceiling - 2336mm
Ex) If H ceiling is 2200mm, H screw height value is calculated as follows:
• d = H ceiling - H Max = 2200mm - 2336mm = -136mm
• H screw height = 100mm - d = 100mm + 136mm = 236mm
H
ceiling
H
screw height
d
H
max
Summary of Contents for PaX-i3D Smart
Page 1: ...PHT 30LFO HARDWARE and SOFTWARE E n g l i s h Installation Manual Version 1 0 0...
Page 2: ......
Page 3: ......
Page 72: ...This page is intentionally left blank...
Page 82: ...This page is intentionally left blank...
Page 92: ...This page is intentionally left blank...
Page 137: ...10 Technical Specifications...
Page 145: ...Pax i3D Smart PHT 30LFO Installation Manual 145 Appendix Schematic diagram Components supplied...
Page 160: ......
Page 161: ...13 Samsung 1 ro 2 gil Hwaseong si Gyeonggi do Korea Postal Code 445 170...