3
. Installing the Equipment
EzRay Air W (Model: VEX-S300W) Installation Manual
15
EN
G
LISH
3. Installing the Equipment
Before Start
Observe wall properties
During installation, the technician is responsible for the assessment
of wall properties and selecting the method of attaching the unit to the
wall.
The wall construction must be able to resist a shear load of 76 kg
(168 lbs) and tractive force of 204 kg (450 lbs) at each attachment
location. Otherwise some additional mounting supports must be used
to fulfill this requirement.
You are advised to plan and study the installation environment
carefully in advance before proceeding, since the installation
involves drilling the wall. Accurate measurement is of critical
importance for successful installation.
The horizontal arm comes with one of three different lengths,
depending on your purchase: L=450 or 600 or 900 mm.
Proceed marking on the wall after performing thorough simulation
several times with the arm provided.
Ensure that the spirit level should rest only on the location
indicated in the figures to obtain the accurate level.
Tape ruler
Drilling template
Spirit level
Marker
Summary of Contents for EzRay Air W
Page 1: ......
Page 2: ......
Page 3: ......
Page 4: ......
Page 54: ...4 Product Specifications 44 EzRay Air W Model VEX S300W Installation Manual...
Page 61: ...Appendix EzRay Air W Model VEX S300W Installation Manual 51 ENGLISH Appendix Drilling Template...
Page 64: ...Appendix 54 EzRay Air W Model VEX S300W Installation Manual This page intentionally left blank...
Page 66: ......
Page 67: ......
Page 68: ......