3
. Installing the Equipment
EzRay Air W (Model: VEX-S300W) Installation Manual
25
EN
G
LISH
3.2.3 Leveling the Power Box Assembly: Front/Rear
1. Place the spirit level on the position as shown in the figure.
2. To adjust the horizontality (level), loosen one wrench bolt by using the wrench.
3. Adjust the headless wrench bolt until the bubble on the spirit level is placed in the
middle.
Allen wrench
5 mm
Since the Power Box Assembly is shipped with one bolt tightened, they
are required to be loosened prior to leveling it.
Summary of Contents for EzRay Air W
Page 1: ......
Page 2: ......
Page 3: ......
Page 4: ......
Page 54: ...4 Product Specifications 44 EzRay Air W Model VEX S300W Installation Manual...
Page 61: ...Appendix EzRay Air W Model VEX S300W Installation Manual 51 ENGLISH Appendix Drilling Template...
Page 64: ...Appendix 54 EzRay Air W Model VEX S300W Installation Manual This page intentionally left blank...
Page 66: ......
Page 67: ......
Page 68: ......