3
. Installing the Equipment
EzRay Air W (Model: VEX-S300W) Installation Manual
23
EN
G
LISH
3.2.2 Mounting the Power Box Assembly (For Concrete walls)
1. Drill the marked points using the hammer drill.
2. Remove the debris and clean the holes using the dust pump.
3. Anchor the bolts (
Part No.19
) with the hammer.
Hammer
Anchor bolt
Part No.: 19
Size: M8 x 30
Qty.: 6 ea
4. Remove the front cover of the Power Box Assembly.
ex) Cabinet Installation Type
Summary of Contents for EzRay Air W
Page 1: ......
Page 2: ......
Page 3: ......
Page 4: ......
Page 54: ...4 Product Specifications 44 EzRay Air W Model VEX S300W Installation Manual...
Page 61: ...Appendix EzRay Air W Model VEX S300W Installation Manual 51 ENGLISH Appendix Drilling Template...
Page 64: ...Appendix 54 EzRay Air W Model VEX S300W Installation Manual This page intentionally left blank...
Page 66: ......
Page 67: ......
Page 68: ......