background image

Doc. # 01

-

04

-

033A

 

 

1)

 

Inspection of LED light Bars. Lift the lid 
and override the safety switch on the 
left side of the cabinet by depressing 
with your finger or a pencil. Put your 
sunglasses on and hit RUN from the 
setup screen. With the lid up view if ALL 
lights are working. If not, proceed to 
step 2. Contact factory for replacement 
light bar.

 

It may be possible to expose screens with 
LED lights out, but a repair is needed to 
ensure optimal performance.

 

Troubleshooting Cont’d

 

Light Bar Replacement / Installation

 

2)

 

Unplug main power cord.

 

3)

 

Remove exposing unit glass, see 
Maintenance section for glass removal.

 

4)

 

Open the maintenance door in the front 
of the unit by removing the (4) #8 sheet 
metal screws with a 1/4” driver.

 

5)

 

Disconnect the defective light bar 
connector (each bar has its own 
connector), then remove the top, #8 nut 
holding down the light bar.

 

6)

 

Installing the new light bar. Seat the 
light bar in its corresponding slot.

 

7)

 

Test the new light bar. See above 
section 1.

 

8)

 

Secure the bar with the #8 nut and 
attach the connector.

 

9)

 

Close the maintenance door and 
replace the #8 sheet metal screws.

 

Slot in back

 

Step 6

 

Light bar connector

 

#8 nut

 

Light bar

 

Step 5

 

Maintenance door

 

Step 4

 

Depress Limit 
Switch when 
testing lights

 

Step 1

 

Note: 

 

 

It is important to wear dark shaded and UV rated 
eye protection while testing any UV Lights.

 

 

Do Not allow objects to contact the UV lights.

 

Pg. 11

Summary of Contents for E-1000

Page 1: ...and date of purchase for future reference Date Electrical Drawing Revision Vastex E mail assistance Purchasing Product Info sales vastex com Electrical Support stech vastex com Tech Support Mechanica...

Page 2: ...Rocking Piston Pump 120 240V P N 04 02 060 1 4 HP Rocking Piston Pump 120 240V P N 04 02 060 1 4 HP Rocking Piston Pump 120 240V P N 04 02 060 1 4 HP Rocking Piston Pump 120 240V P N 04 02 060 Control...

Page 3: ...or entering control box Do not operate if any guard or cover has been removed Do not operate if power cord is damaged Safe Operating Temperature Ambient 55 F 100 F 13 C 38 C Do not attempt to defeat s...

Page 4: ...6 8 For troubleshooting and maintenance instructions see pages 9 12 Stability during use transportation assembling dismantling when out of service testing and foreseeable breakdowns This equipment is...

Page 5: ...t over tighten 1 Install legs if included Place Legs on a clear spot on the floor 28 5 72 5cm apart as shown in picture 1 2 Lock lid handles as shown Carefully lower the exposing unit down onto the le...

Page 6: ...for each size screen Lock lid and set vacuum time to 90 Seconds Start cycle and record the time it takes to flatten the blanket to a size larger than your positive If unsure wait until blanket is fla...

Page 7: ...desired time 4 Press ENTER to confirm selection Setting the exposure time 1 From the setup screen press the number under the label EXPOSURE 2 Enter a time from 0 999 seconds 3 Press DELETE enough time...

Page 8: ...ected Press CANCEL Lower and lock the lid before pressing RUN to remove the warning EXPOSURE INCOMPLETE LID WAS OPENED The lid was opened before the exposure cycle completed The lid must remain closed...

Page 9: ...the cabinet and between the side retainers Slide glass back until it contacts and it seated squarely against the back seal Place the front glass retainer and the three cams against the glass front Ins...

Page 10: ...ust the lid lower Proceed as follows pictures below for reference a Remove both Lid Lifting Cylinders from their upper mounting stud Carefully lower the lid b Rear Seal Adjustment Start with the lid d...

Page 11: ...r glass removal 4 Open the maintenance door in the front of the unit by removing the 4 8 sheet metal screws with a 1 4 driver 5 Disconnect the defective light bar connector each bar has its own connec...

Page 12: ...ory for replacement lights Troubleshooting Cont d UV Black Light Bulb Replacement Installation 2 Unplug main power cord 3 Remove exposing unit glass see Maintenance section for glass removal 4 Open th...

Page 13: ...io will prevent a good gasket seal prevent good detail resolution and increase chances of saw tooth edges Manufacturers recommend an EOM ratio of 10 to 20 percent With an emulsion stencil more is not...

Page 14: ...st Rz numbers possible and can save large amounts of screen room production time Fig 6 Capillary films are best applied with the emulsion up on a hard flat surface Fig 7 Fig 7 Place a screen squeegee...

Page 15: ...licensed trucker shall constitute delivery to Buyer and be determinative of the date and time of shipment and all risk of loss or damage in transit shall be borne by Buyer If the Buyer fails to accept...

Reviews: