background image

 

 

 

Summary of Contents for Easy Blade 24 V

Page 1: ...1...

Page 2: ...battery 13 6 1 Easy Blade 13 6 2 Easy Block 14 6 3 Included in the Box 14 6 4 Additional systems requirements 14 6 5 Push Button 15 6 6 LED indications 15 7 Setup a system 16 7 1 Mechanical connectio...

Page 3: ...storage de Tel 0049 9081 240 86 60 power varta storage com Version 1 Date March 2020 About this manual Please read this instruction manual carefully before beginning any kind of work It contains impor...

Page 4: ...2 General hazard sources If the following instructions for handling the device are not observed this might lead to personal injury or material damage at the device for which Fehler Unbekannter Name f...

Page 5: ...lative humidity inside the room must not exceed 85 Do not clean the system with agents containing acid lye or solvents c Danger from heat ATTENTION Insufficient ventilation of the system Overheating o...

Page 6: ...vel Protection for over current short circuit which is controlled by the BMS hardware 4 th Level Protection passive with current fuse on board 1 4 Certification The battery is qualified acc to UN Reco...

Page 7: ...01 Tampines Junction 529653 Singapore Tel 65 6 260 58 01 Fax 65 6 260 58 12 Arrow Europe Mr Christian Schmidt cschmidt arroweurope com Tel 49 6102 5030 8262 www arrow com VARTA Microbattery Pte Ltd Ro...

Page 8: ...ments of the safety standard UL1642 and the packs in this handbook are certified to additional safety standard IEC62133 2 2017 as well as UN38 3 requirements for transportation SYSTEM HIGHLIGHTS OF VA...

Page 9: ...he end of discharge voltage is reached Nominal Capacity The nominal capacity C denotes the capacity amount in Ah Amp re hours that the battery can deliver at the 5h discharge rate 0 2 C The reference...

Page 10: ...umber of modern high tech products in fields such as robotics Automated Guided Vehicles AGV related Logistics and Agricultural solutions and more They provide long lasting reliable main power occupyin...

Page 11: ...V 25 9 51 8 Operating Temperature Charging 0 o C to 45 o C 0 o C to 45 o C Discharging 20 o C to 55 o C 20 o C to 55 o C Storage 1 to 3 month at 20 o C to 45 o C 1 year at 20 o C to 24 o C 1 to 3 mon...

Page 12: ...age V 25 6 51 2 Operating Temperature Charging 0 o C to 50 o C 0 o C to 50 o C Discharging 20 o C to 60 o C 20 o C to 60 o C Storage 1 to 3 month at 20 o C to 45 o C 1 year at 20 o C to 24 o C 1 to 3...

Page 13: ...13 6 Description of the battery 6 1 Easy Blade...

Page 14: ...mmends to use a M6 screw type for the negative terminal and a M8 screw type for the positive terminal For connection of the modules an additional bus bar or a wires with cable lug is needed b Communic...

Page 15: ...d Charger Please use VARTA approved chargers only The charger datasheet can be provided on request for more information read chapter 10 Description Material number Remark Easy Charger 24 V 57020101401...

Page 16: ...nnection of the modules the connectors will not fit properly When the module connector is placed insert a screw Screw EJOT Delta PT WN5454 30x8 TX10 and tighten it with a torque of 0 4 Nm tbc The modu...

Page 17: ...entation not for fixation The user is responsible to make sure that the module can t move during operation Below table shows the permitted layers in a specific direction Direction Maximal Layers Comme...

Page 18: ...nated at both physical ends of the CAN Bus 7 3 Configuration of a system It is necessary under the following conditions 1 If the modules are connected the very first time 2 If one or more modules are...

Page 19: ...batteries in parallel 7 4 Start the battery system Step 1 Wake up Method 1 Push the Button 3 to 5 seconds on one battery module doesn t matter which module until the LED is flashing green The batteri...

Page 20: ...Status Method 1 Check if the green LED on all Modules is solid green Method 2 Read the Battery Status Register via CAN If all modules are activated continue with Step 3 Step 3 Discharging or Charging...

Page 21: ...eshold for charging and discharging Discharging Charging Fan 30 C 30 C off 30 C 35 C 30 C 32 5 C 25 35 C 40 C 32 5 C 35 C 50 40 C 45 C 35 C 37 5 C 75 45 C 37 5 C 100 Please note for a good circulation...

Page 22: ...this way only one PDO needs to be checked in case of monitoring the system for faults and errors TPDO_1 0x181 PDO 1 1s uint32 mV int32 mA PDO CAN ID Type Node ID Data Event Battery Voltage Battery Ave...

Page 23: ...r also sends the system s requirements for charging to the charging device not used Battery SOC not used Charge Enable TPDO_9 0x264 PDO 1 uint8 uint8 uint8 uint8 100ms uint16 1 256 V uint16 1 16 mA PD...

Reviews: