background image

 

 

 

IMPORTANT

 

Warranty Activation/Installation & Completion Sign Off Sheet 

 
NOTE: This sheet must be completely filled out and returned/faxed (270) 753-3773 to Scoreboard 
Service Company before your warranty can be activated. 
 
Your Serial Number _______________________________________ 
 
Your Model Number _______________________________________ 
 
Date Purchased       _______________________________________ 
 
Sales Agent             _______________________________________ 
 
Person Authorizing Purchase (title) ____________________________ 
 
Date Installation Completed   _________________________________ 
 
Company Or Person Responsible  
For Installation (address/phone number) ________________________ 
 
 
 
This document confirms that the installation for the 8-ft x 20-ft Baseball Scoreboard has been 
completed. All structural, wiring, and power requirements have been met. This unit has been 
powered on and tested in diagnostic and game modes ensuring the functionally of the unit. 
 
 
________________________________ 
 
Scoring/timing equipment responsible party 
 
 
________________________________ 
 
Installer 
  
 
So that we may better serve you, please have this information available in the event you need to 
call technical support. Technical Support:     1-800-411-3136 

 

 

Summary of Contents for 3359

Page 1: ...INSTALLATION INSTRUCTIONS FOR MODEL 3359 www varsityscoreboards com...

Page 2: ...tion Cable controlled systems standard 1 20 ft control cable 1 Junction box cover with built in 5 pin din socket 1 Customer specified length of control cable Wireless systems optional 1 Wireless trans...

Page 3: ...ded with each option package Test the installed system PRODUCT SPECIFICATIONS Overall Dimensions 8 0 tall x 20 0 long x 8 deep shipped in five 5 sections Weight Hanging weight approximately 1 800 lbs...

Page 4: ...two of the 10 angle iron as the top mounting angle iron Ensure that the pin for your clevis will pass through those holes If not it is easier to make changes before going further whether a smaller cl...

Page 5: ...o concrete footers When installing the poles I beams that support the scoreboard it is important to keep the spacing accurate and the faces straight The poles beams should be allowed to stand overnigh...

Page 6: ...nstallation kit making one assembly 3 Install crossover nipples between the cabinets Failure to install crossover nipples will void the warranty 4 Connect ALL crossover cables between cabinets as in t...

Page 7: ...e should run from the scoreboard to a location that is within 10 feet of the scorekeeper s location Here the supplied junction box cover should be installed on a 2x4 single gang junction box The keybo...

Page 8: ...ried in conduit it must be run in sealed watertight conduit from the ground up to the signal cable power access door located on the back of the scoreboard Here it must pass through a rain tight condui...

Page 9: ...None of the scoreboards components should be lit at this time If any components are lit especially with a solid 8 check the crossover connections between cabinets Ensure that the red stripes on the ri...

Page 10: ..._ Date Installation Completed _________________________________ Company Or Person Responsible For Installation address phone number ________________________ This document confirms that the installatio...

Reviews: