background image

 

 

 

  From  the  ground,  run the  control  cable  through  sealed,  raintight  conduit  then  through  a  rain-

tight  conduit  fitting  into  the  left  side  of  the  signal  cable/power  access  door  and  into  the 
scoreboard. 

  Inside  the  scoreboard,  connect  the  control  cable  leads  to  the  appropriate  terminals  on  the 

terminal block, according to the label above the terminal block. 
 

    

 

 

NOTE:  

If the colors of the wires in the control cable differ from those referenced on the label 

or shown in the following diagrams, refer to the notes you made when connecting the control 
cable  to the junction box cover at  the scorekeeper’s location.   Ensure  that  each lead on the 
junction  box  cover  is  connected  to  the  same  color  lead  on  the  scoreboard  terminal  block, 
regardless of the color(s) of the wires in the control cable that connect them. 
  

  Re-secure the signal/power access door to the scoreboard. 

 

NOTE:

  Even if the control cable was not buried in conduit, it must be run in sealed, watertight, 

conduit from the ground up to the signal cable/power access door located on the back of the 
scoreboard.  Here, it must pass through a rain-tight conduit fitting where it will connect to the 
signal cable terminal block inside the scoreboard.  Refer to the installation diagram on page 7 
for a detailed illustration. 
 

RUNNING/CONNECTING THE ELECTRICAL SERVICE 

 

NOTE:

    HAVE  A  LICENSED,  QUALIFIED  ELECTRICIAN  RUN  THE  ELECTRICAL  SERVICE  AND 

CONNECT  IT  TO  THE  SCOREBOARD  IN  ACCORDANCE  WITH  THE  DIAGRAM  ON  THE 
FOLLOWING  PAGE.    A  WATERTIGHT,  NON-FUSIBLE  DISCONNECT  SWITCH,  A  20-AMP 
GROUND FAULT INTERRUPTER, AND A SAFETY GROUND SHOULD BE INSTALLED FOR THE 
20-AMP CIRCUIT CONNECTED TO THE SCOREBOARD.  A 120-VOLT CIRCUIT MUST ALSO BE 
INSTALLED IN A STANDARD DUPLEX OUTLET AT THE SCOREKEEPER’S LOCATION FOR THE 
CONTROLLER’S 12-VOLT DC WALL TRANSFORMER. IF A BATTERY PACK WAS PURCHASED 
WITH THE CONTROLLER, THIS OUTLET BECOMES OPTIONAL. 

 
 

TESTING THE INSTALLED SYSTEM 

 

NOTE:  Please refer to the OPERATORS MANUAL to operate the scoreboard. 

 

Connecting cable-controlled systems: 

 

Summary of Contents for 3359

Page 1: ...INSTALLATION INSTRUCTIONS FOR MODEL 3359 www varsityscoreboards com...

Page 2: ...tion Cable controlled systems standard 1 20 ft control cable 1 Junction box cover with built in 5 pin din socket 1 Customer specified length of control cable Wireless systems optional 1 Wireless trans...

Page 3: ...ded with each option package Test the installed system PRODUCT SPECIFICATIONS Overall Dimensions 8 0 tall x 20 0 long x 8 deep shipped in five 5 sections Weight Hanging weight approximately 1 800 lbs...

Page 4: ...two of the 10 angle iron as the top mounting angle iron Ensure that the pin for your clevis will pass through those holes If not it is easier to make changes before going further whether a smaller cl...

Page 5: ...o concrete footers When installing the poles I beams that support the scoreboard it is important to keep the spacing accurate and the faces straight The poles beams should be allowed to stand overnigh...

Page 6: ...nstallation kit making one assembly 3 Install crossover nipples between the cabinets Failure to install crossover nipples will void the warranty 4 Connect ALL crossover cables between cabinets as in t...

Page 7: ...e should run from the scoreboard to a location that is within 10 feet of the scorekeeper s location Here the supplied junction box cover should be installed on a 2x4 single gang junction box The keybo...

Page 8: ...ried in conduit it must be run in sealed watertight conduit from the ground up to the signal cable power access door located on the back of the scoreboard Here it must pass through a rain tight condui...

Page 9: ...None of the scoreboards components should be lit at this time If any components are lit especially with a solid 8 check the crossover connections between cabinets Ensure that the red stripes on the ri...

Page 10: ..._ Date Installation Completed _________________________________ Company Or Person Responsible For Installation address phone number ________________________ This document confirms that the installatio...

Reviews: