![Varec 2500 Installation And Operation Manual Download Page 70](http://html1.mh-extra.com/html/varec/2500/2500_installation-and-operation-manual_3495994070.webp)
2500 Automatic Tank Gauge
60
Installation and Operations Manual
Figure 8:
2500 ATG (Type C) Gauge Head Spare Parts
Perform these steps to disassemble the gauge head.
Note
Disassemble the gauge head only as far as needed to replace worn or defective
parts.
Warning Vapors
and
possible
flammables!
Make certain that the tank is empty and not
in service. Observe appropriate safety precautions in flammable or hazardous liquid
storage areas. Do not enter or access a tank that has contained hydrocarbons, vapors or
toxic materials until a gas-free environment is certified. Carry breathing equipment when
entering or accessing a tank where oxygen may be depleted with carbon dioxide, nitrogen
or other gases.
27
16
25
15
44
17
2
47
1
33
3
26
8
38
14
10
57
36
41
4
12
31
37
28
18
62
23
56
48
45
55
35
33
29
24
13
11
5
7
9
34
39
6
42
22
19
31
21
40
43
53
54
50
51
49
52
for Cassette
Summary of Contents for 2500
Page 2: ......
Page 6: ...vi Installation and Operations Manual...
Page 10: ...2500 Automatic Tank Gauge 10 Installation and Operation Manual...
Page 16: ...2500 Automatic Tank Gauge 6 Installation and Operations Manual...
Page 66: ...2500 Automatic Tank Gauge 56 Installation and Operations Manual...
Page 68: ...2500 Automatic Tank Gauge 58 Installation and Operations Manual...
Page 108: ...2500 Automatic Tank Gauge 98 Installation and Operations Manual...
Page 112: ...2500 Automatic Tank Gauge 102 Installation and Operations Manual...
Page 118: ...2500 Automatic Tank Gauge 108 Installation and Operations Manual...
Page 123: ......