42PiS-13
RV-12iS
0
01/19/19
PAGE:
REVISION:
DATE:
VAN'S AIRCRAFT, INC.
Step 1: Route the F-00214 forward through the fuselage, following the CT-01204 Fuel Cable Assembly through the snap bushings
as shown in Figure 1.
Step 2: Route the forward end of the F-00214 through the center snap bushing in the F-12103 Tunnel Brace as shown in Detail A
in Figure 1. Ensure the F-00214 is free from kinks along its length and does not interfere or chafe against fuel lines, brake lines,
engine and fuel control cables, etc.
The F-00214 will be connected to the FF-1216 Pitot Line later in this section.
Step 3: Loosely secure the F-00212 and F-00214 to the ES-00301s with plastic tie wraps as shown in
Detail B in Figure 1.
PLASTIC TIE WRAP 8"
ES-00301
(SECTION 21iS/U AND 24iS/U)
F-00216
F-00212
F-00214
F-00216
GARMIN STATIC LINE
F-00214
GARMIN PITOT LINE
F-12103
F-00214
MAIN BRAKE LINES
FF-1216
CT-01204
FIGURE 1: ROUTING THE
AIR-DATA LINES
DETAIL A
DETAIL B
CT-01204
GSU 25
BAGGAGE BULKHEAD
ASSEMBLY