![Valor Ultimate Turbochim BR517R Installer'S Manual Download Page 17](http://html1.mh-extra.com/html/valor/ultimate-turbochim-br517r/ultimate-turbochim-br517r_installers-manual_3865043017.webp)
17
7.1
If the gas supply pipe is to enter through the concealed rear
or side opening, pierce the relevant grommet (See figure 13). If the
supply pipe is sleeved, trim the sleeve back where it enters the
appliance and seal the sleeve to the pipe.
If using the concealed side opening, we suggest that the supply pipe
is cut so that it enters the side of the appliance by approximately
25mm and, after fitting the unit to the wall, using a compression
elbow, connect to a formed pipe running to the appliance elbow.
7.2
An installation template is supplied which includes a diagram
for forming the pipe so that it avoids various components
below the burner
7.3
If the unit is to be fixed to the floor:
•
Place the template in position and mark the floor at the
positions of the two fixing holes.
•
Drill two holes at the marked positions using a no. 10 drill
and plug.
7.4
For fixing the unit to the wall (see figure 14):
•
Offer the unit to the prepared hole in the wall. Gently
push back until the convection box is squarely against the
wall.
•
Mark through the four holes in the convection box side
flanges.
•
Remove the unit.
•
Drill four holes at the marked positions using a no. 10 drill and plug.
7.5
Place the unit back in position.
•
The slack length of cable should be looped in the space at the left side of the
convection box .
7.6
If wall fixing , fit woodscrews through the convection box flanges.
7.7
If floor fixing, fit woodscrews through the convection box base. Replace
the burner unit.
7.8
If necessary, seal any gaps between the wall and the convection box
flanges with a bead of suitable sealant.
7.9
Seal the flue box to the external wall surface.
P A R T 7 :
A P P L I A N C E I N S T A L L A T I O N
Figure 14 Wall fixing positions
Figure 13 Concealed openings