![Valor HORIZON 535 Installation Booklet Download Page 21](http://html1.mh-extra.com/html/valor/horizon-535/horizon-535_installation-booklet_3656764021.webp)
20 of 23
12.
CERAMIC FUEL BED INSTALLATION
12.1.
Ceramic Walls
Installation
1.
Locate the ceramic rear wall
in the channel at back of the
firebox and flat against the back of
the firebox. See figure 36.
2.
Locate the side walls against
the sides of the firebox. Make sure
that they are behind the raised
edges of the burner module base at
the back corners. See figure 37.
3.
Remove two screws from
under the top front of the firebox.
Using these screws fit the port
cover. See figure 38.
12.2.
Ceramic Logs
Installation
1.
Place the ash bed in position.
The projections at the front
of the ash bed locate against
the sloping metal stops
immediately behind the
burner. See figure 39.
2. Place the rear log in
position locating the two top
projections in the ash bed
into the holes in the rear log.
See figure 40.
3.
Place the two front logs
at the front of the firebox as
shown in figure 41.
4.
Identify the right side
center log. It is thinner than
the left side log. Place the
right side center log in
position locating the thick
part on the right side of the
ash bed with its “nose”
resting at the center of the
ash bed as shown in figure
42.
5.
Place the left side center log in position locating the thick
part on the left side of the ash bed with its “nose” resting on top
of the right center log. See figure 43.
Figure 43 Left center log
Figure 41 Front logs
Figure 40 Rear log
Figure 39 Ash bed
Figure 38 Port cover
Figure 37 Side walls
Figure 36 Rear wall
Figure 42 Right center log