7.
Place the hotbox fully back into the fireplace opening so that it is sealed against
the fireplace front surround.
8.
Drill a hole into the fireplace floor through each of the two holes in the base of the
hotbox using a suitably sized masonry drill for the fibre / wooden plugs supplied (See
figure 20).
9.
Insert a fibre / wooden plug into each hole. Use the
fibre / wooden plugs supplied with this appliance -
Never
use plastic plugs instead of the fibre / wooden plugs
supplied
.
Fit a woodscrew in each plug and tighten.
Always screw the base into position before applying
tension to the cables. This will ensure a tight seal
between the top of the hotbox and wall
10.
Fit a cable retainer over the bottom end of each
cable.
11.
Pull each cable taut. Push the cable retainers hard up
against the back panel. The end of the cable
adjuster will pass into the hole. Tighten the screws
in the retainers so that they clamp the cables in
position. Apply tension to the cables by turning the
hexagonal adjusters by hand (See figure 21).
12.
Inspect the installation of the hotbox against
the fireplace surround. If the hotbox is aligned
squarely and the sealing is satisfactory, fully tighten
the cable retainers.
13.
If the hotbox is not correctly aligned, release
the tension on the cables by slackening the screws
and turning the hexagonal adjusters fully
anticlockwise. The hotbox should then
automatically realign itself. Pull each cable taut
again and push the cable retainers back against
the back panel. Again, tighten the screws in the
retainers and apply tension to the cables by
turning the hexagonal adjusters clockwise as far
as possible.
14.
Feed the free length of the cables into the gap
between the inner and outer back panels so that
they are available to allow easy removal and
refitting of the appliance during subsequent
service calls.
Do not cut off the free lengths of
cable.
On precast flue installations feed the
cables into the small holes at the base of the side
panels.
Page 25
©
Baxi Heating U.K. Limited 2008.
INSTALLER GUIDE
Figure 21. Lower cable retention
Figure 20. Floor fixing
Figure 19. Cable route