A V I O N I C S L I M I T E D
SECTION II
Installation
Paragraph
2.1 GENERAL
INFORMATION
2.2
UNPACKING AND INSPECTING
2.3 EQUIPMENT
INSTALLATION
2.3.1 Avionics Cooling Requirements for Panel Mounted Equipment
2.3.2 Pre-Installation
Information
2.3.3 Antenna Installation
2.3.4 Audio Interface
2.3.5 Harness Assembly and Installation Hardware
2.4
Post Installation Check
2.4.1 Post Installation Adjustments
2.4.2 Periodic
Maintenance
INS 422 Installation/Owners Manual
Original Issue – June 2001
VPN 701034
3