Table of contents
2
Instructions on commissioning, maintenance, and troubleshooting for auroSTOR 0020111119_02
Table of contents
1
Notes on the documentation
................................ 3
1.1
Other applicable documents ................................... 3
1.2 Storing
documents
..................................................... 3
1.3 Symbols
used
............................................................... 3
1.4
Applicability of the instructions .............................. 3
1.5
Cylinder identification plate .....................................4
1.6 CE
label
.........................................................................4
1.7 Benchmark
...................................................................4
2
Safety instructions and regulations
..................4
2.1
Safety and warning information .............................4
2.1.1
Classification of action-related warnings .............4
2.1.2
Structure of warnings ................................................4
2.2 Intended
use
................................................................ 5
2.3
General safety instructions ...................................... 5
2.4
Overview of EU standards ........................................6
2.4.1
General information on solar heating system .....6
2.4.2
Cylinder and cylinder assembly .............................. 7
2.5
Regulations for Great Britain ................................... 7
2.5.1 Technical
Guidance
..................................................... 7
2.5.2 Related
documents..................................................... 7
2.5.3
Regulations for the prevention of accidents .......8
3 System
description
..................................................8
3.1
Design and function of solar heating system ......8
3.2 Electrical
wiring......................................................... 10
3.3
Hot water temperature regulation ....................... 10
3.4 Heating
control
.......................................................... 10
4
Description of the components
............................11
4.1
auroSTOR solar cylinder ...........................................11
4.1.1 Safety
devices
.............................................................12
4.1.2
Cylinder operating elements ...................................12
4.2 Solar
fluid
....................................................................14
4.2.1
Properties of solar fluid ...........................................14
4.2.2
Solar circuit frost and corrosion protection
system ..........................................................................14
4.2.3
Cylinder frost protection ..........................................14
4.2.4
Safety data sheet for Vaillant solar fluid .............15
4.3 System
configuration
................................................17
4.3.1
Vaillant controllers and their basic functions .....17
4.3.2 Control
functions
.......................................................18
4.3.3
Technical data of the auroSTOR solar cylinder 20
4.3.4 Dimensions
.................................................................22
5 Assembly
...................................................................23
5.1
Scope of delivery ......................................................23
5.2
Transporting the cylinder .......................................23
5.3
Requirements for installation site ........................23
6 Installation
................................................................24
6.1 Installation
sequence
...............................................24
6.2
Installation of solar circuit piping .........................24
6.2.1
Piping material in the solar circuit .......................24
6.2.2
Layout of piping in the solar circuit .....................24
6.2.3
Realisation of solar circuit piping .........................25
6.2.4
Venting the solar circuit..........................................27
6.3
Pipes for the primary heating circuit ..................29
6.4
Installing hot water pipes .......................................29
6.5
Hot water thermostat mixer ..................................29
6.5.1
Installing the hot water thermostat mixer
(without secondary circulation line) ................... 30
6.5.2
Installing the hot water thermostat mixer
(with secondary circulation line) .......................... 30
6.5.3
Setting the hot water thermostat mixer ............ 30
6.6
Installation of cold mains inlet ...............................31
6.6.1
Pressure in cold mains inlet ....................................31
6.6.2
Mounting the safety assembly ...............................31
6.6.3
Mounting the expansion vessel .............................32
6.6.4
Mounting the drain valve ........................................32
6.6.5
Laying the pipes to the tundish ............................32
6.7
Installation of discharge pipe ................................32
6.7.1
Design of discharge pipe .........................................32
6.7.2 High
drain
...................................................................34
6.8 Electrical
installation
...............................................34
6.8.1
Options for combining control components ......34
6.8.2
Electrical connection of control components ....36
6.8.3
Connecting up the electric immersion heater ... 37
6.8.4
Connection of the solar pump ...............................38
6.8.5
Connecting up the solar yield temperature
sensor ..........................................................................38
6.8.6 Installing the control components in accordance
with the connection wiring diagrams .......................40
7 Commissioning
.........................................................52
7.1 Checking
leak-tightness
..........................................52
7.2
Flushing the solar circuit with solar fluid ...........53
7.3
Filling the solar circuit with solar fluid ................53
7.4
Setting the flow rate in the solar circuit ............ 54
7.5
Flushing the primary heating circuit ...................55
7.6 Water
treatment
........................................................55
7.7
Filling the cylinder ................................................... 56
7.8
Filling the central heating system ........................57
7.9
Commissioning the gas-fired wall-hung boiler 58
7.10
Setting the hot water thermostat mixer ............ 58
7.11
Filling in the commissioning report .................... 58
7.12
Handover to the operator ...................................... 58