4 Boiler installation sequence
Instructions for installation and servicing ecoMAX
12
4 Boiler installation sequence
4.1 General
Fig. 4.1
The boiler should be mounted on a flat and vertical area
of wall of sufficient area for the boiler plus the required
clearances for installation and servicing (fig. 3.8). These
are shown on the installation template supplied with the
boiler and are:
– 5 mm either side of the boiler
– 145 mm below the boiler
– 205 mm* above the boiler when utilising the 100 mm
outside diameter flue
– 220 mm* above the boiler when utilising the 125 mm
outside diameter flue
– 500 mm in front of the boiler**
Note!
If the boiler is to be fitted in a timber framed
building, it should be fitted in accordance with
British Gas publication DM2 ‘Guide for gas
installations in timber framed housing’.
4.1.1 Select position of boiler
Refer to section ‘Boiler location’ for information
regarding siting the appliance. In general the boiler must
be positioned such that:
• There is adequate space around the boiler for service
and maintenance
• The boiler can be correctly flued, i.e. the flue terminal
position is sited in accordance with these instructions
and the air/flue duct can be installed in accordance
with the flue installation instructions supplied.
• All necessary pipework can be connected, including
the pressure relief valve and condensate drain.
** This clearance is only required to enable easier access to the boiler for
servicing and may be provided by an openable door, etc.
4.1.2 Unpack the boiler
To unpack the boiler, cut both plastic carton straps, open
box and lift out the polystyrene top packing. Lift the
cardbox box upwards.
Note!
Care should be taken not to scratch the white
surface of the boiler casing.
Packed in the boiler carton are the following:
• Boiler
• Flow and return central heating service valves
• Gas service valve
• Pressure relief valve
• Pre–formed copper pipework (for central heating flow
and return, gas and pressure relief valve connections)
• Boiler installation template
• Boiler hanging bracket
• Fixing screws, wall plugs and washers
• Installation and user instructions
• Flue installation instructions
• Guarantee card and envelope
4.1.3 Using boiler template
Fix the paper template to the wall ensure that the
template is vertical.
The template shows:
– The position of the fixing holes for the boiler
mounting bracket (1).
– The position of the connections.
– The position of the flue exit hole.
Mark the position of the hanging bracket fixing holes (1).
Drill 2 holes Ø 8 mm for the hanging bracket.
Note!
Use alternative fixing holes where necessary.
4.2 Rear flue exit
Mark the position of the air/flue duct and its circumfe-
rence.
4.3 Other flue options
Flue instructions for other flue systems such as vertical
RSF flues, flues run to the side of the boiler and the use
of additional bends etc. are detailed in the flue
installation instructions provided with the boiler.
Remove the template from the wall and plug the drilled
holes using the wallplugs supplied.
min
min 5
min 5
min 500**
min 14
5
2
0
5
/2
2
0*
80020014605_00GB_032006 22.02.2006 21:35 Uhr Seite 12
Summary of Contents for ecoMAX 635
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ...0020014605_00GB 03 2006 Subject to alteration...