Fig. 4.2 Using Boiler template
4.4 Fitting the boiler hanging bracket
Fix the hanging bracket (2) to the wall using the screws
supplied. (it may be necessary to use additional or
alternative fixings to ensure adequate support).
Note!
If the boiler is to be fitted in a timber framed
building ensure that the bracket is secured to a
substantial part of the timber frame capable of
taking the weight of the boiler.
Fig. 4.3 Fitting the boiler
4.5 Install the flue system
Install the flue system (refer to separate air/flue duct
installation instructions)
4.6 Fitting the boiler
• Lift the boiler (3) up to the wall so that it is slightly
above the hanging bracket (1).
Note!
Lift the boiler from either side at the bottom
edge.
• Lower the boiler slowly onto the hanging bracket so
that the cross member at the rear of the boiler fully
engages onto the hanging bracket.
4.7 Removing the front case
To remove the front section of the case,
proceed as follows:
• Loosen the screw (1) on the bottom of the unit.
• Push in the two retaining clips (2) on the bottom of
the appliance until the case is released.
• Grasp the front case (3) by its bottom edge, pull it
towards the front and remove it by lifting it off the
unit.
85
50
240
75
75
23
50
3
1
2
Boiler casing
Minimum
Clearances
Reqd.
Flow
Gas in
Return
Condensate
discharge
Minimum Clearances
Reqd.
Fixing holes and
Position for
optional
pre-instalation
connection
Flue hole
(80/125 mm
flue system)
Please use
the new
Boiler hanging
bracket
ecoMAX 635
13
Boiler installation sequence 4
Instructions for installation and servicing ecoMAX
13
80020014605_00GB_032006 22.02.2006 21:35 Uhr Seite 13
Summary of Contents for ecoMAX 635
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ...0020014605_00GB 03 2006 Subject to alteration...