5 Installation
10
Installation and maintenance instructions auroFLOW plus 0020149486_04
5.6
Product dimensions and connection
dimensions
200
120
150
30
100
150
450
750
340
110
300
The basic and expansion module of the solar charger must
be hanging directly next to each other. The expansion
module must always be mounted to the left of the basic
module. There must be no difference in height.
5.7
Installation clearance
B
A
C
D
A
A
150 mm (better:
350 mm)
B
200 mm
C
200 mm
D
450 mm
▶
When using the accessories, observe the minimum clear-
ances/installation clearances.
Note
There must be a clearance of at least 150 mm
above and below the product. To facilitate
maintenance, we recommend a clearance of
350 mm.
5.8
Clearance from combustible components
It is not necessary to maintain a clearance between the
product and components made of combustible materials that
go beyond the minimum clearances.
5.9
Mains connection cable
The product is fitted in the factory with a mains connection
cable that has to be connected up permanently on-site.
If the mains connection cable is routed from the bottom right
of the product, it has a length of 1.15 m.
If the mains connection cable is routed from the top right of
the product, it has a length of 1.45 m.
5.10
Noise
Noise occurs during operation. The volume depends on the
design of the solar circuit. Although the noises are relatively
quiet (< 51 dBA), they can be perceived to be disruptive.
▶
Install the product in a sound-proof room (e.g. plant room
or boiler room).