Set-up 4
0020273765_00 atmoMAG Installation and maintenance instructions
7
Num-
ber
Designation
1
Battery (monocells D/LR20)
Note
The battery is inserted in the lower Styrofoam cushion.
4.2
Wall pre-installation
60
60
a
3
1
2
Flush mounting
60
60
c
b
3
1
2
Surface installation
▶
Install the connections as follows:
–
1 = Cold water connection R 1/2
–
2 = Gas connection
–
3 = R 1/2 hot water connection
▶
Observe the following clearances for all product types:
–
a = 92 mm
–
b = 85 mm
–
c
≈
100 mm without thermal isolator device
–
c
≈
145 mm with thermal isolator device
4.3
Minimum clearances
B
A
C
C
D
Minimum clearance
A
50 mm
B
180 mm; optimum approx. 250 mm
C
20 mm; optimum approx. 50 mm
D
500 mm in front of the heat generator to enable
easy access for maintenance work (may be
provided by an opening door).
It is not necessary to maintain a clearance between the
product and components made of combustible materials that
go beyond the minimum clearances.