background image

Installation instructions

Heat pump dryer
One-family household

1014097-R05

07/11/2017

1014097-R05

9

6. Using for the first time

If the location of the appliance is changed, because of the heat pump it must stand in its final position for around 2
hours before it can be operated again. Failure to do this can result in damage to the appliance.

When the appliance is connected to the power supply for the first time, it is possible to carry out a function test. The purpose of the
function test is to check the installation. It takes about 3 minutes. As the heat pump is not tested, the function test can be started imme-
diately after installation. In the event of a mains power failure, the function test cannot be aborted. Once the function test has been run
or aborted, it can no longer be selected and the appliance enters the normal selection mode.

Work steps which do not have to be taken are marked as follows: –

Carrying out the function test

Work steps

12004

12005

12006

Plug appliance in at mains.
In the display appears:

English

fr/it/rm/...

OK

«Language: English»

Select language for function test.

Press 

 to change lan-

guage.

Touch language.

Confirm language for function
test.

Press 

.

Touch 

.

Appliance is ready for function test.

Start function test?

NO:

YES:

 

«Function test»

Start function test.

Press 

.

Press 

.

Touch 

.

Or skip function test.

Press 

.

Press 

.

Touch 

.

Function test is running.

Function test

0h03

«Function test 0h03»

Function test is finished.

Function test complete

Select user language

See operating instructions

See operating instructions

Select viewing angle

See operating instructions

Interrupting or aborting the function test

Work steps

12004

12005

12006

Interrupt function test.

Open appliance door or
press buttons.

Open appliance door or
press buttons.

Open appliance door or
press buttons.

In the display appears:

Indicator light for 

 button

flashes.

Continue function test?

NO:

YES:

«Function test»

Continue function test.

Press 

.

Press 

.

Touch 

.

Or abort function test.

Press 

.

Press 

.

Touch 

.

Next step

Select user language

Select user language

Summary of Contents for Adora TSLQ WP

Page 1: ...ing drum and in the appliance packaging Designation Article no Number See installation step Installation plate incl double sided adhesive tape W40653 1 1 Positioning the installation plate Tower panel...

Page 2: ...e the installation plate to the floor with double sided ad hesive tape S Dampen the mounting slots E on the installation plate with wa ter This makes it easier to push the appliance in Free standing p...

Page 3: ...connection to the left or right 100 100 mm Niche height 860 mm Centre the installation plate in the niche If a device is installed with the V ZUG Home option Connect the network cable to the device V...

Page 4: ...6 11013 and SLQ WP 11004 11014 P Click in the six positioning cams P K S Take out the double sided adhesive tape S and adhere to the mounting surfaces K Tumble dryer Models 12004 12005 12006 Washing m...

Page 5: ...2 Take the tower panel 1 out of its fixture 2 on the back of the tumble dryer 3 1 Install the tower panel 1 on the mounted installation plate 3 2 Inserting the ventilation grille The heat given off f...

Page 6: ...ug and socket devices circuit breakers and fusible cut outs which are accessible after installation and which have all poles switching are permissible as isolating devices Effective earthing and separ...

Page 7: ...A D B C Fasten the drain hose B to nozzle D using the hose clip C Put back the pump cover A Single connections The drain hose must not be submerged in the water in the drain trap Maximum pumping heig...

Page 8: ...n be connected to a double drain trap Drainage into fixed upright outflow pipe with separately routed drainage pipe Drainage into fixed upright outflow pipe with combi drainage set W55969 1200 800 700...

Page 9: ...Carrying out the function test Work steps 12004 12005 12006 Plug appliance in at mains In the display appears English fr it rm OK Language English Select language for function test Press to change lan...

Reviews: