12
ASSEMBLY ORIENTATION:
To the Power Supply
After completing the first five steps you will have the first floor
panel installed and functioning. It should look like this drawing.
The drawing below shows the first panel
(in the upper right-hand)
and it shows how to assemble the rest of
your system. This is the repeated process for any size or arrangement.
To the Power Supply
NON-POWER
TRIM
POWER
TRIM