Connect the two plugs from the Floor Panel to the corresponding sockets on the Powered Trim as shown
in Figure 1-19 and 1-20. Be sure the connections are solid.
Figure 1-19
Figure 1-20
Then slide the Powered trim and the Main Supply Cable
’s tri pie e
in place under the Floor Panel. Line
up the screw holes in the trim with the holes in the Floor Panel and start the bolts. Six one inch stainless
steel bolts will secure the Floor Panel to the trim. After the first panel is installed it should look like
Figure 1-21.
Figure 1-21
NOTE:
If the bolt binds, cross threads
or won’t start
skip it. It is ok to have a missing bolt here and there
then to cross thread or bind it. If a screw gets cross threaded or stripped and stuck there is only one way
to fix It without cracking a floor panel. See the instructions on
Ho to Remo e a Stuck Scre
.
Continue placing panels as shown in Figure 1-12. Start the next row by connecting plugs to the first
panel
’s so kets.
Continue placing panels to the left and so on. Non-powered trim pieces can be
attached at any time during the assembly. Secure all bolts only when all done.