background image

Copyright® Urban Coop Company all rights reserved.  This document is provided to you for your 

own personal limited use as a paying customer to assemble your coop. We consider these 

instructions company intellectual property and are granting you limited personal use only.

Do not copy or distribute without written permission of Urban Coop Company.

Urban Coop Company

TM

Find your inner farmer

 TM

Round-Top Chicken Coop

Model: Walk-In

Assembly Instructions V1.0 F

Please Read: 

Understanding these concepts will help guide you through the instructions.

Ÿ

The coop is assembled in three sections (I)Run Assembly (ii) Roost Assembly, and (iii) Egg Box 

Assembly. 

Wire side of panels face to the inside of coop.

Ÿ

Mating edges of parts to be flush and tight will keep measurements in tolerance as the coop grows in 

size.

Ÿ

Brown screws are 3” and use T-25 bit. Green screws are 1 5/8” and use T-20 bit.

Ÿ

Having a flat surface ~ 10’x10’ is required for the coop to assemble well.

Ÿ

Several steps will require that you work comfortably from a 6’ step ladder. Get help for these steps if 

needed.

Ÿ

We estimate 8-12 hours for two people of ordinary skills to assemble.

Ÿ

You will need a cordless drill, hammer and a tape measure. All else is provided.

Ÿ

Drive screws only deep enough to hold parts tight and not bury the heads too deeply.

Ÿ

Many pre-drilled screws holes are driven upside-down so as not to be a place to collect water, look for 

pre-drilled holes under parts too.

Ÿ

There are some screw holes that must be field drilled. The brown and green screws are very agressive 

and will drive with no pre-drilled hole. Keep screw entry points in the meat of the wood and not too close 

to edges. Screws in knots or close to edges should be pre-drilled. A countersink bit is enclosed in case 

you run into this situation.

Ÿ

Rough Cedar may have knots or cracks that are normal for this wood. We cull and cut around any 

imperfections we deem structurally problematic during manufacturing. If you get a piece that you feel is 

not acceptable, please let us know. We build to ~1/8” tolerance. Cedar expands and contracts 

considerably and some gaps between boards is to be expected. In any event, they should not be greater 

than 1/8”.

Spending the time up front to identify all the parts and lay them all out will pay off in 

the long run and make assembly go more smoothly. The instructions are intended to 

be read in page order as, the information builds in that way, then referenced during 

assembly. Pre-reading the instructions will help immensely.

Search:

 Round-Top Walk-In Coop

Summary of Contents for Round-Top Chicken Coop Walk-In

Page 1: ...ill hammer and a tape measure All else is provided Drive screws only deep enough to hold parts tight and not bury the heads too deeply Many pre drilled screws holes are driven upside down so as not to...

Page 2: ...C G Recommended North F Egg Box Outside Wall B Run Egg Box Side Wall C Run Roost Side Wall G Roost Outside Wall TM Run built rst Roost built second Egg Box built last 3 Sub Assemblies Note Door can b...

Page 3: ...Parts Identi cation...

Page 4: ...le Sti ener D Run Assembly Back Side D1 X3 Wired Back Panels D2 Back Roof Arc Run Front Back Parts List Round Top Walk In Coop Copyright All Rights Reserved Urban Coop Company TM Find your inner farme...

Page 5: ...Section Support Strut B4 X2 Octagonal Jump Bars B5 X4 Jump Bar Brackets B6 Metal Drip Flashing Run Egg Box Side Parts List Round Top Walk In Coop Copyright All Rights Reserved Urban Coop Company TM Fi...

Page 6: ...ccess Door Assemblies C3 X2 Wire Upper Transom Vent Panels C4 Mid Section Support Strut Lower C5 Mid Section Support Strut Upper Run Roost Side Parts List Round Top Walk In Coop Copyright All Rights R...

Page 7: ...X2 E5 Run Roof Panels 107 X3 Run Roof Parts List Round Top Walk In Coop Copyright All Rights Reserved Urban Coop Company TM Find your inner farmer TM E1 Mid Arc 4X E2 Roof Supports 34 7 8 Run Eave Boa...

Page 8: ...s G12 X3 Roof Supports G13 X3 Roof Support Brackets G14 X1 Mid Roost Bar Support Bracket G15 Roost Roof Panels 103 X 2 Roost Parts List Round Top Walk In Coop Copyright All Rights Reserved Urban Coop...

Page 9: ...llection Door Assemblies F11 X2 Wired Lower Eggbox Panels F12 Egg Box Mid Panel F13 X2 Eave Boards Outer F14 X1 Eave Boards Middle magnet F15 X2 Egg Box Roof Metal F16 X1 Feed Compartment Roof Metal E...

Page 10: ...H10 100 Neoprene Washer Roof Screws H11 3 Door Hinges X4 24 8 1 1 2 Screws H12 Bit Holder H13 T 25 Bit H14 T 20 Bit H15 2 Phillips Bit H16 Window Bolts X8 if not attached H17 12 Stake Nails X2 H18 2 L...

Page 11: ...Section 1 Run Assembly...

Page 12: ...side Screw the Run Lower Egg Box Run Wall Assembly B onto the Lower Run Back Wall Assembly D using two brown T 25 screws keeping edges ush and the D wall overlapping the outside edge of the B wall Se...

Page 13: ...side Attach the C1 C2 Left assembly to the C4 C5 Strut assembly making top edges ush Repeat for the C1 C2 Right side too Attach rear lower D Run Back Wall Assembly to the C Run Roost Wall lower assemb...

Page 14: ...you may want to get some help for these steps Please be careful Any roof metal can have sharp edges We attempt to knock of sharp corners and edges from roof metal You must be the nal determiner of sh...

Page 15: ...the B2 egg box door and B3 Mid Strut assembly assemble in prior steps Use at least 2 screws per panel Beveled upper edges of B1 panels will be slanting down and out Use at least two of the T25 brown...

Page 16: ...ws up into C3 parts at least 3 screws per side Make sure to get at least 1 screw from each panel into C5 strut top Note There may be a Brown T 25 screw holding the C2 doors shut for shipping Drive T25...

Page 17: ...to tops of A3 parts Repeat the above process for the Run Assembly Back D Wall using at least 6 of the T 25 screws to attach D2 to the top of the D1 panels Install the Mid Arc Support Brackets E4 using...

Page 18: ...ng the level in di erent spots and level the coop in all directions vertical and horizontal and make sure that it is not rocking Some settling will occur and it is okay but this is the time to get it...

Page 19: ...1 T25 Brown screw from inside of back side of E1 pockets so the screw drives through E1 and into E2 ends See Fig Repeat process in step for back set of E2 Roof Supports that hook into D2 Back Arc Secu...

Page 20: ...ong upper beveled 2x4 of B C walls and top face of eaves should t substantially ush along the top edges of all three arcs giving a smooth surface for the roof metal to roll onto Adjust the board angle...

Page 21: ...top roof panel over edge of lower roof panel that is resting on the E2 roof support and align grooves to where they are overlapping and fasten several of the H10 Neoprene Washer Roof Screws using the...

Page 22: ...Section 2 Roost Assembly...

Page 23: ...will fall correctly if bottom is ush Using Green T 20 screws attach 3 G11 eaves centering middle board rst and then placing left and right ones next making back beveled edge of eave boards ush with t...

Page 24: ...nd right G13 Roof Support Brackets with top beveled edge ush see Fig with the top beveled edge of bracket ush with top of eave board Note Green T20 screws should drive into frame lumber or they will s...

Page 25: ...panel being the one with the edge cut o and the upper panel laying on top of the lower panel Preposition panels on ground to ascertain orientation where screw holes line up With help position panels...

Page 26: ...Landing rests on the installed block on the back side of C4 and is held in place by Brown T25 Screws driven through the C4 Strut into G6 and through the outside G Roost Wall into the other side of G6...

Page 27: ...Section 3 Egg Box Assembly...

Page 28: ...up from the bottom into the upper rails to hide the screw heads indicate minimum number of screws at joints for X s assembly to be strong more is okay See Fig for how sides join to back It is correct...

Page 29: ...n capturing the B4 Bars in the holes of the brackets Screw 2 screws from the back side of the B2 Panels in the pre drilled holes See Photo Make sure bottom edge is ush so bar stays out of way of door...

Page 30: ...ated by attach to the Run X s on both sides From Inside the Run use T25 Brown Screws to attach front edge of oor by driving screws through B wall panels into the front edges of the Egg Box Floor Panel...

Page 31: ...brush will reach in Within about 30 seconds of applying glue insert two halves of pipe together twisting and rotating hales and at the same time pushing completely in and lining up Nipples in a row A...

Page 32: ...ll the way down Repeat for other side Make sure edge rails are facing out Insert F9 Upper Feeder Holster Bracket with holes toward you and tap down until it is several inches below top edge of F12 Sho...

Page 33: ...ecure using Green T20 screws with edges overhanging F6 Inner Dividers equally on both sides Top surface of eaves and top surface of Inner F6 Dividers should be ush Position F15 Roof Panels as indicate...

Page 34: ...onto opposite side of Door hinges and position to where hole on side of handle aligns with seam indicated by and leave a 1 1 4 inch overhang of handle beyond edge of door frame See Fig Attach A5 Handl...

Page 35: ...Elevations For Reference Only...

Page 36: ...Front Elevation Round Top Walk In Coop Copyright All Rights Reserved Urban Coop Company TM Find your inner farmer Door Round Top Walkin Chicken Coop TM Round Top Chicken Coop...

Page 37: ...Egg Box Side Round Top Walk In Coop Copyright All Rights Reserved Urban Coop Company TM Find your inner farmer Egg Box Side View TM 24 Sticks Up About 1...

Page 38: ...Run Roost Side Wall Round Top Walk In Coop Copyright All Rights Reserved Urban Coop Company TM Find your inner farmer Roost Side View TM...

Page 39: ...Roost Side View Round Top Walk In Coop Copyright All Rights Reserved Urban Coop Company TM Find your inner farmer Roost Side View...

Page 40: ...Back Elevation Round Top Walk In Coop Copyright All Rights Reserved Urban Coop Company TM Find your inner farmer TM 2 Roof Overhang...

Page 41: ...Cross Section Looking Front to Back Round Top Walk In Coop Copyright All Rights Reserved Urban Coop Company TM Find your inner farmer F B C G...

Reviews: