www.uponor-usa.com • www.uponor.ca
16
Uponor Climate Co˘ntrol™ Zoning System Installation Guide
17
Testing the Base Unit Actuator
1. Press the button of the selected channel.
�
• The LED lights up: the actuator is powered up
(time for actuator opening is roughly 5 minutes).
• The LED does not light up.
Note:
See
Section 11: Troubleshooting
for guidance.
2. Press the Test button twice to end the actuator test
(or wait 10 minutes).
Final Inspection
1. Verify that the antenna is correctly mounted.
Check if the thermostats are powered.
2. Close the cover of the base unit. Close the
thermostat covers where necessary.
3. Complete the installation report (
Section 12
).
4. Leave installation guide at jobsite for future reference.
Section 6
Interface with
Base Unit Installation
This section describes the installation of the
Climate Co˘ntrol Zoning System Interface in
control systems with up to three base units.
Example of an Installation
A system may consist of up to three base
units managed by a single interface.
Interface
Base unit (possible installation
with three base units
connected to one interface)