P a g e
| 13
ÜKYP/YP Automatic Fuel Loading, Central System Heating Boiler Usage and Maintenance Manual
6.
Second Pass Smoke Pipes: It is the smoke path that allows the flame formed in the combustion
pot to enter the back of the boiler after licking the inferno and hit the front cover.
7.
Third pass smoke pipes: It is the channel through which the hot smoke leaving the boiler
passes.
MODEL-
SERIES
ÜKYP/YP
130
160
180
200
250
300
350
400
450
500
600
FUEL TYPE
WOOD PELLET
POWER
kW
130
160
180
200
250
300
350
400
450
500
600
kcal/h 111.800 137.600 154.800 172.000 215.000 258.000 301.000 344.000 387.000 430.000 516.000
FIRE POT
DIMENSIONS
mm
Ø480
600x600
FUEL CAPACITY
kg
200
280
330
WATER VOLUME
lt
320
400
480
560
640
890
925
1240
1195
1505
1570
BOILER WEIGHT
kg
805
920
1080
1155
1300
1755
1900
2130
2200
2505
2750
NECESSARY DRAFT
mbar
0,30-
0,35
0,35-0,45
0,35-0,50
0,40-0,50
0,50-0,60
TEMP. CONTROL
RANGE
°C
40-80
INSTALLATION
RETURN TEMP.
°C
40
MAX. OPERATING
PRESSURE
bar
3
TEST PRESSURE
bar
5
D
IM
EN
SI
O
N
S
TOTAL WIDTH
(a)
mm
1460
1560
1660
1940
1990
2200
DEPTH (b)
mm
1615
1815
1915
2280
2400
2750
BODY WITH (c
)
mm
760
860
960
1130
1180
1390
FLUE
CONN.HEIGHT
(d)
mm
1615
1815
1915
1465
1600
1665
1675
AUGER
DISASSEMBLY
mm
1100
1200
1300
TOTAL
HEIGHT
mm
1640
2000
2055
2095
2125
FLUE CONNECTION
DIAMETER
mm
220
300
350
MIN-MAX FLUE
TEMPERATURE
°C
230-250
BOILER
FLOW/RETURN
R”
2”
2 ½”
DN80
DN100
DN125
SAFETY
FLOW/RETURN
R”
1 ½”
2”
FILLFING
DISCHARGING
R”
3/4”
ELECTRICAL
CONNECTION
V/Hz
230V-50Hz
400V-50Hz