SAFETY WARNINGS
The electrical installation of this product must be carried out by authorized personnel in
accordance with the descriptions given in this manual and applicable local or national
regulations.
THIS PRODUCT MUST BE CONNECTED TO ELECTRICITY BY GROUND LINE!
The boiler must be connected to a flue that complies with the specifications specified in the user
manual and relevant regulations. The chimney must provide the traction value required by the
connected boiler. The boiler must not be operated without a flue connection and there must be
sufficient traction for combustion. The boiler should never be operated in chimneys where sufficient
traction is not provided. Any incorrect electrical installation in the place where the boiler is installed
must be removed.
In case of boiler replacement in boiler rooms, the old boiler should be removed or its connection with
the chimney should be cut off, the cut place should be sealed and insulated. Under no circumstances
should more than one boiler be connected to the same chimney. Cylindrical chimney can be passed
through the chimney in the figure.
Smoke chimneys should not be placed on the outer wall
of the building unless there is a technical necessity. The
wall thickness of the chimney walls should not be less
than the thickness of one brick. Perforated bricks and
briquettes should never be used in chimney construction.
It should be plastered from the inside and outside and a
cylindrical pipe should be inserted into the rectangular chimney.
It should be ensured that fresh air enters the area where the boiler is installed. In this regard, the
dimensions specified in the guide should be taken as reference. The boiler should never be installed in
living quarters or in a place directly connected to such a place. In order to reduce the risk of scaling
and corrosion in old and new installations, the instructions given in the relevant section of this manual
should be applied by the installer who installed the boiler. In particular, if the boiler is connected to an
old installation, it is necessary to completely clean the waste inside the installation before installation.