Installation, Operation and Maintenance Manual
VariCool EZ-Fit
35
Subject to change without notice.
Water-Cooled Unit
Installing contractor should verify the following items�
1�
Is there any visible shipping damage?
Yes
No
2�
Is the unit level?
Yes
No
3�
Is proper vibration isolation provided in accordance with IOM?
Yes
No
4�
Are the unit clearances adequate for service and operation?
Yes
No
5�
Do all panel and/or access doors open freely and are the handles operational?
Yes
No
6�
Have all shipping braces been removed?
Yes
No
7�
If iDDP/DDP fans are installed, have shipping blocks been removed and spring isolators been
adjusted?
Yes
No
8�
Have all electrical connections been tested for tightness?
Yes
No
9�
Does the electrical service correspond to the unit nameplate?
Yes
No
10�
On 208/230V units, has the transformer tap been adjusted to the voltage being applied?
Yes
No
11�
Has overcurrent protection (breakers/fuses) been installed to match the unit nameplate
requirement?
Yes
No
12�
Do all fans rotate freely?
Yes
No
13�
Does the field water piping to the unit appear to be correct size and pressure rating per design
parameters?
Yes
No
14�
Does the inlet (supply) water piping of the main water loop run to the inlet water connection of the
unit?
Yes
No
15�
Does the outlet (return) water piping of the main water loop run to the outlet water connection of the
unit?
Yes
No
16�
Is all copper tubing isolated so that it does not rub?
Yes
No
17�
Are air filters installed with proper orientation?
Yes
No
18�
Have condensate drain and p-trap been connected?
Yes
No
19�
Is the condensate trap primed with water?
Yes
No
20�
Is the TXV sensing bulb in the correct location?
Yes
No
21�
Does the TXV sensing bulb have proper thermal contact and is properly insulated?
Yes
No
22�
Are all ship loose items installed and wired properly?
Yes
No
Pre Startup Checklist