Sageon II 200A (N+1) Power Distribution System
Configuration and Operation
PM990-5202-200, Rev. 6
4-3
Parameter
Description
48V System
Range
48V
System
Default
User
Value
Eq duration
Maximum duration of Equalization
charging
3-48Hr
20Hr
Eq period
Time between periodic Equalization
charging
Off, 0-52wk
Off
Manual
Stop/Start Eq
Force stop/start of Equalization charging
Toggle state
LVDS Trip
Battery voltage below which LVDS will
open
40-48V
42.6V
BDT Per
Period between consecutive discharge
tests
Off, 0-365
days
Off
BDT Time
Time of day to begin BDT (hr:min)
00:00-23:59
02:00
BDT Dur
Maximum duration of BDT
5-1,440 min
180 min
BDT Curr
Discharge test current
0-5,000A
50A
BDT End V
Battery voltage limit to terminate BDT
36-48V
44V
BDT End Q
Battery capacity limit to terminate BDT
25-9,995AH
300AH
Temp Sen
Alarm
Enable/disable temp. sensor failure
alarm
On/Off
On
4.1 THE “HOME” SCREEN
The HOME screen, shown at right, is the default screen. It shows
Sageon 200A output current and voltage. This screen also shows the
present mode: FLoat or EQualize.
The HOME screen is the first to appear when power is applied to the system. Since the HOME screen is
the default screen, the display will revert to the HOME screen from any other screen if an operator panel
push button is not pressed for approximately one minute. Section 4.5 describes in detail the selections
available from the HOME screen.
4.2 USING THE OPERATOR PANEL PUSH BUTTONS
Use the six buttons to view system data, individual rectifier data, battery data, or the alarm log. In
addition, programmable parameter values can be viewed and changed. Each button is described below.
The HOME screen shows the system voltage and current. From the HOME screen, press “up arrow” or
“down arrow” to move through the series of menus described in Section 4.5.
RECT
BATT
LOG
INC
DEC
ENTER
FIGURE 4-1 OPERATOR PANEL
160A 54.2
FL