C.I.B.
UNIGAS
- M03
9126CE
8
Overall dimensions (mm)
*S = measure referred to burner fitted with standard blast tube
*L = measure referred to burner fitted with extended blast tube
PBY1030/1040: It is necessary to place a counterflange between the burner and the boiler.
A(*S) A(*L) AA
AD
AH
AI
AM B(*S) B(*L) BB
C
CC
D
E
F
G
H
K
L
M
N
O
P
PP
RR
SS
T
W
Y
Z
PBY1025
1784 1980 377
25
304 404 335 376 572 641 1408 680 1312 680 632 472 522 660 815 M16 651 460 460
x
x
265
80
49 1145 379 330
PBY1030
1761 2006 377
25
138 608 589 353 598 657 1408 680 1312 680 632 633 524 660 815 M16
x
460 460 800 900 265
80
49 1145 400 330
PBY1040
1769 1988 377
25
138 608 589 361 580 657 1408 680 1312 680 632 671 731 660 815 M16
x
460 800 800 900 265
80
49 1145 400 330
Boiler recommended drilling
template (PBY1025)
Burner flange
Reccomended counterflange
(PBY1030/1040)
Boiler recommended drilling
template (PBY1030/1040)
Summary of Contents for PBY1025
Page 40: ...C I B UNIGAS M039126CE 40...
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 81: ...RWF55 5X RWF55 6X User manual M12926CA Rel 0 2 11 2023...
Page 82: ...2 DEVICE INSTALLATION Fixing system Drilling dimensions...
Page 103: ......
Page 104: ...23 Note Specifications and data subject to change Errors and omissions excepted...
Page 113: ......
Page 114: ......
Page 115: ......
Page 116: ......
Page 117: ......
Page 118: ......
Page 119: ......